My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3329
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 3:52:39 PM
Creation date
6/3/2022 9:11:06 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3329
Date (mm/dd/yyyy)
05/19/2022
Description
Second Amend w/Craig A. Smith for Civil Eng Svcs for the Central Island Area Pump Stations & Drainage Improv
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F FG�3g 4 <br />t �Tr aF suEA hyo <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 City Hall <br />(305) 949-3113 Fax <br />MEMORANDUM <br />TO: Honorable Mayor and City Commissioners <br />VIA: Stan Morris, City Manager <br />FROM: Rick Labinsky, P.E., City Engineer <br />DATE: May 19, 2022 <br />RE: Approval of Second Amendment to Agreement with Craig A. Smith for the <br />Central Island Stormwater Project <br />RECOMMENDATION: <br />Staff recommends approval of this Resolution. <br />REASONS: <br />The City of Sunny Isles Beach desires and Consultant agrees, to revise Section 6 of the Agreemen <br />titled "Term", from 180 days to 2 years to extend the contract to project completion. Coordination <br />with the North Miami Beach water project to mitigate disruption to the community twice caused a <br />worthwhile delay. There is no additional funding required for approval of this item. <br />This is the area of our City North of 174th St. to 183rd St. in the Central Island area. Over the year <br />there have been several attempts to accelerate the removal of storm water to eliminate any flooding <br />in this section of our City. To date these attempts, have not resolved the problem. We have engaged <br />Craig A. Smith, the same Engineering Firm that successfully completed the Stormwater Project of <br />174th St. approximately five years ago. The plans will include the installation of stormwater pumps in <br />this area, utilizing a similar type of system as we have in Golden Shores. <br />FUNDING SOURCE: <br />Funds have been appropriated in account no. 300-5-5410-465000-83003. <br />ATTACHMENTS: <br />Resolution <br />Second Amendment <br />Item Number: 10.1 <br />305 <br />
The URL can be used to link to this page
Your browser does not support the video tag.