My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3330
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:43:08 AM
Creation date
6/3/2022 9:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3330
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Calvin, Giordano & Assoc., Inc. to provide revisions, permitting, & post design svcs for Golden Shores Pump Station Rehabiliation Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3.6 The Consultant shall coordinate with the City during the bidding process and be available <br />to address bidders' questions and comments at any time during the bidding process. The <br />Consultant shall attend the pre-bid meeting, which will be held at a location as specified <br />by the City. <br />2.3.7 The Consultant shall be available as necessary to assist the City in the evaluation of all bids <br />received for determination of compliance with the bidding requirements. The Consultant <br />shall not be responsible for performing any investigations or reference checks regarding <br />bidders, nor shall it be responsible for determining whether a bid is responsive or a bidder <br />is responsible; however, the Consultant shall assist the City as necessary in making such <br />determination. <br />2.3.8 The Consultant will investigate, study, and analyze any proposed substitutions of materials <br />or equipment and shall advise the City with respect to same. <br />2.4 ADMINISTRATION OF CONSTRUCTION <br />2.4.1 The Consultant shall perform those duties and discharge those responsibilities set forth <br />herein in Sections 2.4.2 through 2.4.13. Furthermore, the Consultant shall perform and be <br />responsible for all services requested of the Consultant by the City relating to the <br />interpretation and implementation of the Consultant's drawings, specifications, or other <br />Construction Documents or other contract documents prepared by the Consultant. <br />2.4.2 The Consultant shall represent the City during construction and shall facilitate all <br />instructions and other appropriate communications between the City and the Contractor, <br />which shall be communicated through the Consultant. The Consultant shall act on behalf <br />of the City only to the extent provided herein and in the Construction Contract. <br />2.4.3 Upon receipt, the Consultant shall carefully review and examine the Contractor's Schedule <br />of Values, together with any supporting documentation or data that the City or the <br />Consultant may require from the Contractor. The purpose of such review and examination <br />will be to protect the City from an unbalanced Schedule of Values that allocates greater <br />value to certain elements of the work than is indicated by the supporting documentation or <br />data or, than is reasonable under the circumstances. If the Schedule of Values is not found <br />to be appropriate, or if the supporting documentation or data is deemed to be inadequate, <br />and unless the City directs the Consultant to the contrary in writing, the Schedule of Values <br />shall be returned to the Contractor for revision or supporting documentation or data. After <br />making such examination, if the Schedule of Values is found to be appropriate as <br />submitted, or if necessary, as revised, the Consultant shall sign the Schedule of Values <br />thereby indicating its informed belief that the Schedule of Values constitutes a reasonable, <br />balanced basis for payment of the Contract Price to the Contractor. The Consultant shall <br />not sign such Schedule of Values in the absence of such belief unless directed to do so, in <br />writing, by the City. <br />2.4.4 The Consultant shall observe the work of the Contractor on a periodic basis. The purpose <br />of such observations will be to determine the quality, quantity and progress of the work in <br />3 <br />343 <br />
The URL can be used to link to this page
Your browser does not support the video tag.