My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3330
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:43:08 AM
Creation date
6/3/2022 9:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3330
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Calvin, Giordano & Assoc., Inc. to provide revisions, permitting, & post design svcs for Golden Shores Pump Station Rehabiliation Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) working days after the occurrence of the event, or the first appearance of the condition <br />giving rise to such claim. The City's representative shall determine whether the Consultant <br />is entitled to a time extension for the delay. The failure of the Consultant to give such <br />notice shall constitute a waiver of any claim under this section. <br />2.6.4 Notwithstanding the provisions of Subparagraph 2.6.3, in the event that the Contractor fails <br />to substantially complete the Project on or before the Substantial Completion date specified <br />in the Construction Contract or the Contractor is granted an extension of the time to <br />complete performance under the Construction Contract and the Consultant's Contract <br />Administration Services are materially extended by the City as a direct result thereof and <br />through no fault of the Consultant, the Consultant shall be entitled to additional <br />compensation at the rates shown in attached EXHIBIT "2". The amount of compensation <br />due by the Consultant under this Subparagraph shall be pursuant to approved written <br />Amendment to this Agreement. <br />2.7 PERSONNEL <br />2.7.1 The Consultant shall assign only qualified personnel to perform any service concerning the <br />Project. At the time of execution of this Agreement, the parties anticipate that the following <br />named individuals will perform those supervisory or primary functions indicated: <br />FUNCTION <br />Chris Giordano President <br />So long as the individuals named above remain actively employed or retained by the <br />Consultant, they shall perform the functions indicated next to their names. Furthermore, <br />the City reserves the right to reject any proposed substitution for any of the above named <br />individuals, and the City shall have the further right to require that any individual assigned <br />to the Project by the Consultant be removed from the Project and reassigned for good cause. <br />SECTION 3 CITY'S BASIC DUTIES TO CONSULTANT <br />3.1 The City shall provide the Consultant with adequate information regarding the City's <br />requirements for the Project including any desired or required design or construction <br />schedule, or both, and any budgetary requirements including fixed limit of construction <br />cost, prior to the start of the Construction Documents Phase of design, upon which the <br />Consultant shall be entitled to rely. <br />3.2 The City shall review any documents submitted by the Consultant requiring the City's <br />decision, and shall render any required decision pertaining thereto in a timely fashion. <br />3.3 The City shall furnish structural, mechanical, chemical and other laboratory tests, <br />inspections and reports as required by law or the Construction Contract. <br />3.4 If the City becomes aware of any fault or defect in the Project, nonconformance with <br />the Construction Contract, or of any errors, omissions or inconsistencies in the <br />7 <br />347 <br />
The URL can be used to link to this page
Your browser does not support the video tag.