WHEREAS, on November 191h, 2020, via Resolution No. 2020-3101, the City Commission <br />approved Change Order No. 7 for upgrades to the garage fire alarms system, and a 365 -day <br />contract extension to allow for analysis of electrical usage in order to design and install an <br />emergency generator, in an amount not to exceed $92,908.61; and <br />WHEREAS, on May 211t, 2021, via Resolution No. 2021-3192, the City Commission <br />approved Change Order No. 8 for additional fire alarm devices for elevator doors, replacement <br />of existing double doors to incorporate to comply with ADA requirements, replacement of AC <br />filters prior to execution of a warranty agreement, and a 365 -day contract extension to allow for <br />analysis of electrical usage in order to design and install an emergency generator, in an amount <br />not to exceed $95,096.74; and <br />WHEREAS, on September 14th, 2021, via Resolution No. 2021-3244, the City Commission <br />approved Change Order No. 9 for waterproofing and sealing of expansion joints at the second <br />and third floors, including supervision, scan, core drilling, insurances, cleaning and protection, <br />removal, cleaning, and application of new sealant in existing expansion joints, providing and <br />installing six floor drains in the second and third floors, including PVC rough tie into existing <br />roof drain in each floor, and overhead and profit, in an amount not to exceed $47,357.00; and <br />WHEREAS, the Contractor has submitted Change Order No. 10 for increase in material <br />costs related to the sliding glass doors, and a 180 -day contract extension to allow for the installation <br />of an emergency generator; and <br />WHEREAS, the City now wishes to approve Change Order No. 10 to the Agreement with <br />Nunez Construction, Inc. for the Gateway Park Center Project for additional services, in an <br />amount not to exceed Six Thousand Seven Hundred Sixty -Three Dollars and Fifty -Nine Cents <br />($6,763.59), bringing the total contract amount not to exceed Six Million Eighty -Three Thousand <br />Five Hundred Forty -Five Dollars and Three Cents ($6,083,545.03), attached hereto as Exhibit <br />„A„ <br />NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY <br />ISLES BEACH, FLORIDA, AS FOLLOWS: <br />Section 1. Approval of Change Order No. 10. The City Commission hereby approves Change <br />Order No. 10 to the Agreement with Nunez Construction, Inc. for the Gateway Park Center <br />Project for additional services, in an amount not to exceed Six Thousand Seven Hundred Sixty - <br />Three Dollars and Fifty -Nine Cents ($6,763.59), bringing the total contract amount not to exceed <br />Six Million Eighty -Three Thousand Five Hundred Forty -Five Dollars and Three Cents <br />($6,083,545.03), attached hereto as Exhibit "A". <br />Section 2. Authorization of City Manager. The City Manager is hereby authorized to <br />execute said Change Order No. 9, and to do all things necessary to effectuate this Resolution. <br />Section 3. Effective Date. This Resolution will become effective upon adoption. <br />@BCL@980B5080.doc Page 2 of 3 365 <br />