Laserfiche WebLink
Proposal to Furnish Professional Services <br />City of Sunny Isles — Ritz Carlton Trailer Site <br />New Building <br />Architect's Project No. 2217 <br />Page Two <br />SECTION 4 — PRELIMINARY ESTIMATE based on initial site information: <br />$300,000.00 +/- <br />SECTION 6 - PROPOSED SCHEDULE: <br />Complete Project Schedule: <br />• Field Investigation —1 week <br />• Design/Construction Documents — 100% — 8 weeks <br />• Bidding -Permitting— 4 weeks <br />• Construction Administration — 8 months <br />SECTION 7 - COMPENSATION: <br />The City of Sunny Isles Beach, FL shall pay the Architect for the Basic Services as described above a Stipulated Fixed <br />Sum of Twenty -Six Thousand Dollars ($26,000.00). <br />The proposed fee is applicable to each phase of the services as follows: <br />Preliminary Design <br />10% <br />$2,600.00 <br />Construction Documents — 100% <br />70% <br />$18,200.00 <br />Bidding -Permitting <br />5% <br />$1,300.00 <br />Construction Administration <br />15% <br />$3,900.00 <br />Total: <br />$26,000.00 <br />Additional Services (if needed — NTE) $5,000.00 <br />Reimbursables (NTE) $1,000.00 <br />Total: $6,000.00 <br />Grand Total: <br />submitted; <br />Z ARCHITECTS, INC <br />$32,000.00 <br />RODRIGUEZ ARCHITECTS, INC. <br />559 <br />