Laserfiche WebLink
Scope: <br />• FEMA grant coordination <br />and application <br />• Beach design <br />• Construction Administrator <br />• Drone pre- and post- <br />surveys <br />Cummins Cederberg designed and permitted an emergency beach <br />nourishment project to partially restore the beach for Bal Harbour Village <br />until a larger project by the USACE could be implemented. <br />The beach and dunes had experienced significant erosion following <br />Hurricane Irma and had been awarded a grant from FEMA for beach <br />restoration. Cummins Cederberg assisted the Village in administering the <br />FEMA grant. Our assistance included compiling and filing the quarterly <br />reports, submitting documentation of completed work, coordination with <br />the grant manager at FDEP, and facilitating a post-construction grant audit <br />by FEMA. Cummins Cederberg also assisted the Village in requesting a <br />time extension under the assumption that the sand placement work <br />would be completed by December 2020 due to turtle season construction <br />restrictions. <br />Construction drawings were prepared for the sand placement and <br />construction methodology was coordinated with the contractor. Cummins <br />Cederberg provided construction administration services for the Village <br />to manage construction. Drone aerial photographs were collected during <br />construction to document progress efficiently. <br />Cummins Cederberg provides ongoing support with the Village’s coastal <br />management program through a continuing services contract. <br />Dune Nourishment <br />Bal Harbour Village, Florida <br />50RFQ No. 22-06-01