My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miller Legg Response to RFQ No 22-06-01 Continuing Services for Landscape Architectural Services CCNA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(22-06-01) Landscape Architectural Services CCNA
>
Responses
>
Miller Legg Response to RFQ No 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 10:25:23 AM
Creation date
6/30/2022 10:23:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 29Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA <br />4.1 Firm Qualifications and Experience <br />“Miller Legg’s past experience with this complex process <br />was the reason we selected the firm for the project and <br />their diligence, expertise and patience throughout was <br />extremely helpful.” <br /> City of South Miami First Parks & Recreation <br />Master Plan <br />Quentin Pough, CPRP <br />Director of Parks and Recreation <br />“Miller Legg staff has always demonstrated quality <br />technical and management skills and they ensure they <br />fully understand our projects in order to meet our <br />requirements and needs” <br /> School Board of Broward County Office of <br />Facilities and Construction <br />Divine Amoah <br />Architectural Engineering Manager <br />“Their staff expertise and professionalism have been <br />remarkable and I am extremely satisfied with the result” <br />City of Miami Baywalk Phase 3 <br />Capital Improvements Program <br />John DePazos <br />Sr. Project Manager <br />“The staff demonstrate a wealth of technical expertise <br />and develop practical solutions to project challenges” <br /> City of Pembroke Pines Foxcroft Wetland <br />Mitigation Area <br />George Wrves <br />Project Manager <br />“Miller Legg is thoroughly professional, responsive, <br />communicative and technically skilled” <br />City of Doral Glades Park <br />Barbara Hernandez <br />(former) Parks and Recreation Director <br />“They have approached their work with sensitivity <br />and enthusiasm, presenting solutions to scope and <br />permitting challenges while adhering to the project <br />budget and timetable” <br /> City of Homestead Biscayne Everglades <br />Greenway <br />Pedro Reynaldos <br />Director of Parks & Recreation <br />”I have found the staff to be very competent, proactive <br />and timely with task completion. They manage <br />assignments extremely diligently and have been very <br />helpful in accommodating some last-minute inspection <br />requests.” <br /> City of Coral Springs Continuing Landscape <br />Architecture and Landscape Inspection Services <br />Claudia Alzate <br />Coral Springs Arbor & Horticulture Manager <br />Public Works Department <br />“Their professional staff were well-versed with Broward <br />County’s rules and regulations for surface water <br />management.” <br /> City of Lauderhill Lauderhill Sports Park <br />J. Martin Cala <br />DEES Director/City Engineer <br />“The project went very smoothly and the client was very <br />happy with the final product” <br /> City of Miramar Forzano Park Improvements <br />Juan Vasquez <br />Vice President <br />RJ Behar (Prime) <br />“The staff at Miller Legg have been amazing to work <br />with. The team is very professional and timely with all <br />requests.” <br /> City of Tamarac East Side Parks Feasibility Study <br />Linda Probert <br />Parks & Recreation Assistant Director <br />“We highly recommend Miller Legg.” <br />Boca Raton Beach and Parks District Red Reef Park <br />Master Plan Update <br />Arthur Koski <br />Executive Director <br />“Miller Legg provided excellent landscape design services <br />at short notice, coordinating very well with the City of <br />Fort Lauderdale. They have been very responsive during <br />design and post-design services of this Neighborhood <br />Enhancement project”. <br />FDOT District 4 Fort Lauderdale Sistrunk Pedestrian <br />Enhancements <br />Amin Ahmed <br />Project Manager <br />Stanley Consultants (Prime) <br />“This was a high priority project that had to be <br />completed in time for a major event. Miller Legg provided <br />outstanding service throughout all phases to assist us in <br />meeting our deadline with a quality product.” <br />Broward College Bailey Hall Landscape Improvements <br />William Gallo, AIA <br />Vice President <br />Gallo Herbert
The URL can be used to link to this page
Your browser does not support the video tag.