|
Page 524.2. Qualification of Key Personnel Assigned to Engagement
<br />Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
<br />
<br />Years of Experience: 4
<br />Years With the Firm: 3
<br />
<br />Education:
<br />Master of Landscape Architecture
<br />Florida International University, 2019
<br />Bachelor of Arts, Religion, Minor in Education
<br />Florida State University, 2014
<br />
<br />
<br />Professional Experience:
<br />Mr. Bradley is a Landscape Designer
<br />supporting the firm's projects including
<br />those in the public sector such as
<br />municipal parks and recreation master
<br />plans, park landscape, hardscape and
<br />irrigation design, educational facilities as
<br />well as streetscape for the Florida
<br />Department of Transportation.
<br />
<br />Relevant Project Experience:
<br />
<br />City of Miami Fairlawn Community
<br />Park - Under our continuing services
<br />contract with the City of Miami, Miller
<br />Legg was awarded the development of
<br />programming, pre-design/concept,
<br />design, construction document
<br />preparation and construction phase
<br />services for a new park on SW 63rd
<br />Avenue. The scope includes civil
<br />engineering, landscape architecture,
<br />certified arborist, surveying and SUE,
<br />structural, electrical and geotechnical
<br />engineering as well as permitting, opinion
<br />of probable cost and limited
<br />construction administration. The passive
<br />park will contain a shaded/fenced
<br />children's playground, dog run, shared
<br />pedestrian / bicyclist perimeter path,
<br />light bollards, benches, pedestrian pole
<br />lighting, irrigation, water fountain, bike
<br />racks, receptacles, hardscape furniture,
<br />access driveway and perimeter privacy
<br />walls. Permitting will be coordinated
<br />with the City of Miami, Miami-Dade
<br />County DERM, WASD and SFWMD.
<br />Survey services include boundary and
<br />topographic and tree inventory. Miller
<br />Legg will assist the City with the
<br />presentation of conceptual designs at
<br />Community Meetings to gather public
<br />input for a final design.
<br />
<br />City of Miramar Historic Public
<br />Safety Complex - The City of Miramar
<br />replaced the Civic Center and Child
<br />Care building with a new one-story
<br />24,000 SF building to accommodate its
<br />police substation, storage, administrative
<br />and other law enforcement and public
<br />safety facilities, in addition to a surface
<br />parking lot for safety vehicles. The new
<br />building was certified Gold LEED
<br />certification. Miller Legg provided civil
<br />engineering design, permitting and
<br />construction administration services as
<br />part of the Architects Design Group
<br />team. Government permitting included
<br />the City of Miramar, Broward County
<br />and FDEP. The firm also provided LEED
<br />certification and value engineering review
<br />services.
<br />
<br />City of Plantation Parks &
<br />Recreation Master Plan - Miller Legg
<br />was selected to prepare the first
<br />Plantation Parks and Recreation Master
<br />Plan. The firm provided comprehensive
<br />recreation planning to create the Master
<br />Plan. The Parks and Recreation Master
<br />Plan is a tool intended to help the City of
<br />Plantation meet the current and future
<br />recreation needs of the community. The
<br />resident-driven plan serves as a source
<br />of applicable decision-making
<br />information, and establishes clear goals
<br />and actionable objectives to guide staff,
<br />advisory committees, and City Council in
<br />their work to maintain and enhance
<br />Plantation’s system of parks, recreation
<br />facilities, and programs over the next ten
<br />years. The Plan was based upon research
<br />of existing facilities and programs,
<br />recreation opportunities and needs
<br />analyses specific to City of Plantation
<br />demographics. To effectively gather and
<br />disseminate information during the
<br />planning phase, Public Outreach was an
<br />important focus of the project. Public
<br />workshops and Public Online Survey
<br />assisted in determining community
<br />recreation needs and desires. All 42
<br />Parks and 5 Community Centers sites
<br />were reviewed, along with future
<br />expansion opportunities to
<br />accommodate program requirements. In
<br />addition, Miller Legg assisted the City to
<br />achieve its prestigious national CAPRA
<br />(Commission for Accreditation of Park
<br />and Recreation Agencies) accreditation,
<br />a demonstrated management system of
<br />best practices and measure of agency
<br />quality of operation, management and
<br />service to the community.
<br />Michael Bradley, MLA
<br />Landscape Designer (15% Availability)
<br />
|