Laserfiche WebLink
1 <br />ri <br />is <br />Clien <br />City of Miami Beach <br />NORTH BEACH OCEANSIDE PARK <br />1701 Meridian Ave, 3rd Floor, <br />Miami Beach, FL � <br />Miami Beach, FL 33139 <br />9 <br />'onfar; IrriOnII ion <br />Miami Beach issued a simple request: to re -design a park. Specifically, the Request for <br />Ariel Guitian <br />Qualifications stated that the work products for the North Beach Oceanside Park would include <br />Senior Capital Projects Coordinator, <br />conceptual drawing(s), surveying, geotechnical, design development, estimate(s) of probable <br />Office of CIP <br />construction cost, construction documents, permitting, bidding/award, and construction <br />305.673.7071 x 4105 <br />administration services. Embedded within the expectations of the City was a critical design <br />ArielGuitian@miamibeachfl.gov <br />component — the final design must define a new identity for the North Beach community by <br />,I " 1. ., <br />tapping into and revealing established values and qualities present in the site. The resultant <br />(�,', i <br />"�"�` <br />2016 (On-going) <br />design took the densely -vegetated, 30 -acre park and conceived it as a series of carefully <br />orchestrated thresholds where park users will never feel secluded, inactive or unengaged. <br />The design resulted in a necklace of 'pods' that operate as a spine to the project and serve to <br />Park Master Planning <br />protect habitat and increase the City's management of these natural resources. The walkways <br />Landscape Architecture <br />are scaled so that they foster continuous activities in potentially endless configurable ways and <br />Civil Engineering <br />augments the opportunities for resiliency design by strengthening the dune, utilizing passive <br />Electrical Engineering <br />green infrastructure and LID stormwater management strategies. The project also incorporated <br />Resiliency Design <br />a rebranding of the City's established beachfront with an on -grade beachwalk destined to be a <br />Environmental Permitting <br />terminus to the City's overall transportation infrastructure. The product developed for the park <br />Surveying <br />is one that will provide an immediate transformative quality for the North Beach Community, <br />Construction Administration <br />it will enhance cultural celebration, and it embodies the City's values of good, environmental <br />Arch Visualizations & 3D <br />design and access to great public spaces. <br />$ 840,000.00 <br />$10.3 Million <br />City of Sunny Isles Beach I RFQ #22-06-01 1 Continuing Services for Landscape Architectural Services CCNA 18 <br />