Laserfiche WebLink
Town of Davie <br />6591 Orange Drive <br />Davie, FL 33314 <br />(.;ont�ict II1for!IIafloll "If Tif71G of 1110jE ci <br />Jonathan Vogt, PE <br />Town Engineer <br />Tel: 954.797.1197 <br />Jonathan—Vogt@davie-tl.gov <br />1'rojecj:I? lt, <br />2014-2020 <br />Civil Engineering <br />Traffic Engineering <br />Landscape Architecture <br />Surveying and Mapping <br />Post Design Services <br />$ 460,000.00 <br />_i <br />t.Oil,,Ii!I!;iiCi!I CO;i <br />$ 6,443,081.26 <br />NOVA DRIVE COMPLETE STREETS <br />IMPROVEMENTS (CIGP FUNDED) <br />Davie, FL <br />CGA recently completed the design, permitting (SFWMD, CBWCD, THISCD, BC-HCED), <br />bidding services and post design services for the Nova Drive Improvements project (from Davie <br />Road to University Drive) for Town of Davie. The construction scope of work includes 2521 <br />LF of Exfiltration Trench, 4067 LF of RCP (12" to 30" diameter), 75 storm inlets/manholes, <br />regrading of swales, adding medians, upgrading ADA compliance, signalization improvements, <br />a new roundabout, bike lanes, and associated roadway infrastructure improvements. <br />The eastern commercial end of the corridor was updated from a 3 -lane section to a 4 lane <br />divided section with bike lanes and wide sidewalks while the western, residential section was <br />widened to accomodate bike lanes and/or sharrows. A roundabout justification report with <br />public outreach was required to permit the roundabout in a non-traditional location within in <br />the corridor with the purpose of reducing speeds and allowing easy "u -turns". The project <br />also included upgrading the signalization at the intersection of College Avenue and Nova Drive. <br />The construction cost is $6.3 million. CGA's professional services fee for the project is <br />$459,475. <br />[J City of Sunny Isles Beach j RFQ #22-06-01 1 Continuing Services for Landscape Architectural Services CCNA 20 <br />