My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(22-06-01) Landscape Architectural Services CCNA
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 10:49:45 AM
Creation date
6/30/2022 10:47:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />85)JI <br />Calvin, Giordano & Associates, Inc. <br />p A SAFEbuitf COMPANY <br />Resilience planning is challenged in that the porous geology does <br />not allow for protection from sea level rise just through the use <br />of levees or seawalls, the relatively flat topography increases <br />the area prone to flooding and subject to surge, the dense urban <br />development limits open space and green infrastructure options, <br />the rising seas are impeding drainage of the regional flood control <br />system, and the protections provided by offshore reefs and <br />other marine systems are degrading due to ocean acidification. <br />Although the porous geology of south Florida does not allow <br />for protection from sea level rise just with levees or seawalls; <br />seawalls can however provide a level of protection from storm <br />surge, nuisance and seasonal high title flooding, and short- <br />term elevated water levels in canals. CGA understands these <br />vulnerabilities and challenges: With each project that is assigned, <br />CGA is committed to ensuring the most tangible and feasible <br />mitigation and adaptation strategies are incorporated into each <br />project to enhance the resiliency of the City to the impacts from <br />climate change. <br />Electrical Engineering <br />The CGA Electrical Department has broad capabilities for the <br />infrastructure and the end use development for municipal, <br />commercial, and industrial projects. The types of services <br />provided include: <br />• Sports Lighting <br />• Street Lighting <br />• Area Lighting <br />• Energy Conservation <br />• Power Distribution <br />• Communication System Distribution <br />• Interior Lighting <br />• Telephone <br />• Cable TV <br />• SCADA <br />Construction Administration / Inspection <br />CGA has an outstanding in-house Construction Engineering Inspection Team with the training, certifications, and experience <br />to handle any roadway, bridge, building, park, or utility construction project, including urban roadway reconstruction, rural <br />widening or resurfacing, fixed and movable bridges, drainage, lighting and signalization, as well as landscape installation/ <br />relocation inspection and maintenance monitoring services. <br />In addition, ourteam possesses the expertise to assist with numerous specialized construction services such as constructability <br />reviews, traffic control plan analysis, environmental services, public information, survey, utility coordination, schedule and <br />claims analysis, innovative contracting method recommendations, value engineering proposals, and innovative, project specific <br />special provision development to address unique technical or administrative aspects of a project. The CGA Team possesses <br />keen awareness of technical issues that will establish the management processes necessary to foresee and resolve issues <br />including: <br />• Leadership: Strong management, engineering, and technical skills as well as experience in similar urban projects, with <br />the ability to foresee potential conflicts and ensure their resolution does not affect the project budget and/or schedule <br />• Communication: Effective communication skills and a demonstrated ability to work with the City, the Contractor and <br />the Community through close and frequent communication with all project stakeholders <br />;� City of Sunny Isles Beach i RFQ #22-06-01 1 Continuing Services for Landscape Architectural Services CCNA 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.