My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(22-06-01) Landscape Architectural Services CCNA
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 10:49:45 AM
Creation date
6/30/2022 10:47:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />JORGE R. CERVANTES, PE <br />Electrical Engineer <br />YEARS WITH THE FIRM <br />YEARS OF EXPERIENCE <br />34 <br />EDUCATION <br />Electrical Engineering (1986), <br />University of Oklahoma - Norman, <br />OK <br />CERTIFICATIONS AND LICENSES <br />PE Florida No. 45832 <br />Florida Building Code 2020, 7th <br />Edition Significant Code Changes <br />Certification <br />Mr. Cervantes has 34 years of experience in designing lighting and power systems for roadways, <br />parks, manufacturing, commercial, residential and educational buildings, engineering project <br />fee estimates, lighting consultant expert witness. His experience includes lighting verification <br />and/or recertification of roadway, stormwater pump station power systems, recreational parks, <br />parking structures and outdoor parking areas. He is an expertise in AutoCAD. <br />RELEVANT EXPERIENCE <br />Pine Island Park Renovation <br />Renovation of the existing parking lot area <br />lighting, new sidewalk decorative lighting, <br />upgrade of sports lighting and poles as <br />required, new soccer fields, and new <br />concession, restrooms and park recreation <br />office buildings <br />Plantation, FL <br />Waterford Park Renovation <br />Renovation of the existing tennis courts, <br />volleyball court, basketball courts and <br />racquetball courts and new pickleball courts <br />Davie, FL <br />SW 2nd Avenue - FTL DDA <br />This road contains sidewalks and paved <br />road. Design and coordination of the street <br />lighting levels per FDOT <br />Fort Lauderdale, FL <br />Middle Beach Recreational Corridor and <br />North Shore Open Space Park Renovations <br />Renovation of the existing sidewalks and <br />beautification of the open spaces <br />Miami Beach, FL <br />Bonaventure Park <br />New Park construction for the beautification <br />of the surrounding areas <br />Weston, FL <br />Raymond P. Oglesby Preserve Park <br />Renovation <br />Renovation of the existing parking lot area <br />lighting, new sidewalk decorative lighting <br />Pembroke Park, FL <br />Pedestrian Bridge <br />Design and coordination of the bridge <br />lighting levels as per FDOT Greenbook 2016 <br />edition requirements. Utilizing latest low <br />voltage LED rail mounted fixtures and proper <br />spacing, the FDOT Greenbook requirements <br />were met <br />Bal Harbour Island, FL <br />Three Island Reuse Water Main <br />The existing pump control panel was to <br />replace with a new control panel to meet the <br />Client's requirements and needs <br />Hallandale Beach, FL <br />SW Quadrant Drainage Pump Station <br />The pump station is the key to maintain the <br />water level during storm by running two 125 <br />HP pumps <br />Hallandale Beach, FL <br />Golden Shores Pump Station Rehabilitation <br />The pump station is the key to maintain the <br />water level during storm by running two 75 <br />HP pumps <br />Sunny Isles Beach, FL <br />Roadway and Street Lighting <br />Design, coordination and supervision. <br />Design numerous street lighting upgrades <br />and improvements <br />Davie, FL <br />SW Quadrant Drainage Control Structure <br />The control structure is the key to maintain <br />proper water level in the canal by allowing <br />the motor gates opening and closing <br />Hallandale Beach, FL <br />Lift Station #18 <br />Electrical design coordination and design <br />of the proposed sewage pump station, <br />coordination with local utility companies <br />Davie, FL <br />59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.