City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160
<br />(305) 947-0606 phone (305) 949-3113 Fax
<br />employed or utilized by Contractor in the performance of this Contract. This indemnification
<br />shall survive the term of this Contract.
<br />7.16 Miscellaneous
<br />7.16.1 Two (2) weeks prior to the Pre -Construction Meeting the Contractor shall submit
<br />to the City Maintenance of Traffic Plans. Approval by the City of this plan is a condition
<br />precedent to payment of any sums to the Contractor. The Contractor furthermore agrees to
<br />cooperate with the City and all other appropriate governmental entities with respect to the
<br />control, regulation, scheduling, and management of construction traffic. Contractor shall be
<br />solely responsible for furnishing all labor, material, and equipment and performing all
<br />operations in connection with traffic control, including but not limited to providing signage,
<br />directional assistance (flaggers), police details, or any other labor and equipment necessary to
<br />ensure the proper maintenance of traffic in accordance with the Project Specifications and all
<br />applicable codes, regulations, and laws.
<br />7.16.2 Contractor shall ensure that the Work does not impede individual or vehicular
<br />access to private property throughout the duration of the Work. Contractor may propose
<br />temporary facilities to ensure access to private property provided the same is approved by
<br />the City.
<br />7.16.3 Contractor shall not enter upon, access, or disrupt private property. To the extent
<br />that the Work may require Contractor to enter upon or access private property, the Contractor
<br />shall immediately notify the City and shall not enter upon said private property unless
<br />provided express permission by the City. The City shall not provide the Contractor access
<br />to private property without first obtaining the private property owner's consent.
<br />7.16.4 The City will provide the Contractor with Work Activity Notices (Door
<br />Hangers), which Contractor shall post on affected private properties no less than two (2)
<br />days in advance of planned Work affecting said properties.
<br />7.16:5 The Contractor shall be responsible for, and shall pay the cost of, all temporary
<br />facilities used, or made available, during the course of the Work. These facilities include,
<br />but shall not be limited to, electric power, gas, water, sewage and sanitation, waste removal
<br />and disposal, telephone, and temporary office supplies and equipment. The Contractor shall
<br />timely pay for all such temporary facilities and shall coordinate the installation and removal
<br />of such facilities including, but not limited to, any required coordination with any utility
<br />company. Furthermore, the Contractor shall be responsible for, and shall pay the cost of,
<br />any utility work which may be necessary in order to perform the Work required by the
<br />Contract Documents; this responsibility includes, but is not limited to, the cost of installing,
<br />moving, or relocating electric, water, sewer, gas, or other utility lines, wires, poles, pipe, and
<br />any other equipment of every kind and nature.
<br />7.16.6 The Contractor shall be responsible for receiving, off loading, storing and
<br />securing materials supplied by utility companies in furtherance of the Work. Any damage,
<br />loss, or deterioration to said materials shall be the sole responsibility of the Contractor.
<br />Unitec Inc. 18
<br />
|