Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />Representative, and/or the City's Consultant and this Contract, the terms of this Contract <br />shall control with respect to the Contractor. <br />8.2.10 If the Contractor fails any inspection which requires a re -inspection by the <br />City's Representative or any of its consultants, the Contractor shall bear the cost of such <br />repeat inspection(s) which cost may be deducted by the City from any sums otherwise due <br />the Contractor. <br />8.3 Claims by the Contractor <br />8.3.1 Except as prohibited in Paragraph 8.3.5.1 herein below, all Contractor claims <br />shall be initiated by written notice and claim to the City and the City's Representative, as <br />applicable. <br />Such written notice and claim must be furnished within three (3) days after occurrence of <br />the event, or the first appearance of the condition giving rise to the claim. <br />8.3.2 Pending final resolution of any claim of the Contractor, the Contractor shall <br />diligently proceed with performance of this Contract and the City shall continue to make <br />payments to the Contractor in accordance with this Contract. The resolution of any claim <br />under this Paragraph 8.3 shall be reflected by a Change Order executed by the City, the <br />City's Representative and the Contractor. <br />8.3.3 Claims for Concealed and Unknown Conditions -- Should concealed and <br />unknown conditions encountered in the performance of the Work (a) below the surface of <br />the ground or (b) in an existing structure be at variance with the conditions indicated by <br />this Contract, or should unknown conditions of an unusual nature differing materially from <br />those ordinarily encountered in the area and generally recognized as inherent in Work <br />of the character provided for in this Contract, be encountered, the Contract Price shall be <br />equitably adjusted by Change Order upon the written notice and claim by either party made <br />within three (3) days after the first observance of the condition. As a condition precedent <br />to the City having any liability to the Contractor for concealed or unknown conditions, the <br />Contractor must give the City and the City's Representative written notice of, and an <br />opportunity to observe, the condition prior to disturbing it. The failure by the Contractor to <br />make the written notice and claim as provided in this Subparagraph shall constitute a waiver <br />by the Contractor of any claim arising out of or relating to such concealed or unknown <br />condition. <br />8.3.4 Claims for Additional Costs — Except as prohibited in Paragraph 8.3.5 herein <br />below, if the Contractor wishes to make a claim for an increase in the Contract Price, as a <br />condition precedent to any liability of the City therefore, the Contractor shall give the City's <br />Representative and the City written notice of such claim within three (3) days after the <br />occurrence of the event, or the first appearance of the condition, giving rise to such claim. <br />Such notice must be given by the Contractor before proceeding to execute any additional or <br />changed Work. The failure by the Contractor to give such notice and to give such notice <br />prior to executing the Work shall constitute a waiver of any claim for additional <br />compensation. <br />Unitec Inc. 21 <br />