My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3362
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 4:57:15 PM
Creation date
8/15/2022 11:26:11 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3362
Date (mm/dd/yyyy)
07/21/2022
Description
Awarding RFP No. 22-04-01, agreement w/ Unitec, Inc., for deployment of Citywide Fiber Optic Network.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />1.5.7 Words or terms used as nouns in this Contract shall be inclusive of their singular <br />and plural forms unless the context of their usage clearly requires a contrary meaning. <br />1.5.8 The Contractor shall have a continuing duty to read, carefully study and <br />compare each of the Contract Documents, and shall give written notice to the City of any <br />inconsistency, ambiguity, error, or omission which the Contractor may discover with <br />respect to these documents before proceeding with the affected Work. The issuance, or the <br />express or implied approval by the City, the City's Representative, or the City's Engineer <br />of the Contract Documents shall not relieve the Contractor of the continuing duties imposed <br />hereby, nor shall any such approval be evidence of the Contractor's compliance with this <br />Contract. The City has requested the City's Engineer to only prepare documents for the <br />Project, including the Specifications for the Project, which are accurate, adequate, consistent, <br />coordinated, and sufficient for construction. HOWEVER, THE CITY MAKES NO <br />REPRESENTATION OR WARRANTY OF ANY NATURE WHATSOEVER TO THE <br />CONTRACTOR CONCERNING SUCH DOCUMENTS. By the execution hereof, the <br />Contractor acknowledges and represents that it has received, reviewed, and carefully <br />examined such documents, has found them to be complete, accurate, adequate, consistent, <br />coordinated and sufficient for construction, and that the Contractor has not, does not, and <br />will not rely upon any representation or warranties by the City concerning such documents <br />as no such representation or warranties have been or are hereby made. The Contractor <br />further acknowledges and represents that it has made a thorough and careful examination <br />and inspection of existing surface conditions on the Project site, and the Contractor <br />expressly acknowledges and agrees that it shall make no claim for additional compensation <br />due to existing site conditions including, but not limited to, rock, surface and subsurface <br />water, existing structures, and deficient soil, provided said conditions could be determined <br />or ascertained from a thorough and careful examination and inspection of the site. <br />1.5.9 In the event of any conflict in the Contract Documents, the following documents <br />shall take precedence in the following order of precedence: <br />(a) any Change Orders; <br />(b) the Addenda; <br />(c) the Specifications; <br />(d) the Drawings; <br />(e) any Supplemental Conditions; <br />(f) the Contract for Construction; <br />(g) the City's RFP; <br />(h) the Contractor's Representations made at the Post -bid Conference; <br />(i) the Contractor's Response <br />As between numbers and scaled measurements on the Drawings, the numbers shall <br />govern; as between larger scale and smaller scale drawings, the larger scale shall govern. <br />1.5.10 Neither the organization of any of the Contract Documents into divisions, <br />sections, paragraphs, articles, (or other categories), nor the organization or arrangement of <br />the Design, shall control the Contractor in dividing the Work or in establishing the extent <br />or scope of the Work to be performed by Subcontractors. <br />Unitec Inc. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.