My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3362
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 4:57:15 PM
Creation date
8/15/2022 11:26:11 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3362
Date (mm/dd/yyyy)
07/21/2022
Description
Awarding RFP No. 22-04-01, agreement w/ Unitec, Inc., for deployment of Citywide Fiber Optic Network.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />2.2 The Contractor shall perform all of the Work required, implied or <br />reasonably inferable from, this Contract as specifically set forth in the Contract <br />Documents. The Contractor agrees to comply with the City of Sunny Isles Beach <br />permitting requirements, including all licensing requirements associated with the <br />Public Works Department. <br />2.3 Unless expressly permitted or allowed by the Contract Documents, substitutions <br />of materials, articles, systems, equipment, or other components of the Work will not <br />be considered. Where substitutions are expressly permitted or allowed by the Contract <br />Documents, the Contractor must demonstrate to both the City and the City's <br />Representative that a proposed substitution is equal in substance, quality and function to <br />the material, article, or piece of equipment identified in the Contract Documents. The City <br />shall have no obligation to accept a proposed substitution and no substitution shall be allowed <br />without the prior written approval from both the City's Representative and the City. If the <br />substitution results in a savings to the Contractor, the City shall be entitled to a credit for the <br />amount saved as a result of the substitution. <br />2.4 The Contractor acknowledges and agrees that the term "flowable fill", included <br />in Contract Documents as a specific unit price, includes removal and disposal of unsuitable <br />spoil material and is subject to the City's approval before including flowable fill into the <br />Work. <br />ARTICLE III <br />CONTRACT TIME <br />3.1 Time <br />3.1.1 The City shall notify the Contractor in writing of the date on which the Work <br />shall begin ("the Notice to Proceed Date"). The Contractor shall commence site activities <br />on the Notice to Proceed Date, and the Work shall be carried on regularly and without <br />interruption. The Work shall be substantially completed within one -hundred and eighty <br />(180) calendar days from the Project initiation specified in the Notice to Proceed <br />("Substantial Completion Date") and completed within two hundred and seventy (270) <br />calendar days from the Project initiation date specified in the Notice to Proceed ("Final <br />Completion" or "Final Completion Date"). The total two hundred and seventy (270) calendar <br />days include weekend days and holidays. <br />3.2 Notice to Proceed <br />3.2.1 Once a Notice to Proceed has been issued, the Contractor shall be responsible <br />for the timely and successful completion of the Work and shall endeavor to provide all <br />applicable agencies having jurisdiction with all the required documentation needed to <br />successfully and timely continue the progress of the Work. This may include, but is not <br />limited to providing all necessary documentation in the form of shop drawings, <br />clarifications, calculations, technical data, protocols, product approvals, etc. <br />3.2.2 Under no circumstances will the City accept claims or be responsible for delays <br />arising from failed, unsuccessful, untimely, or late inspections or rejections of inspected <br />Work due to the fault of the Contractor for not supplying all of the necessary documentation <br />Unitec Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.