My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nunez
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(22-09-02) Re-Bid Renovations to the William "Bill" Lone Restroom Facility
>
Responses
>
Nunez
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2022 11:32:20 AM
Creation date
10/17/2022 11:30:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cif!• Or <br />LONE BEACH ACCESSnn <br />RESTROOMS <br />RENOVATIONSBILL <br />�RAI <br />Th, Hvlght of Living <br />BID PRICE SHEET - OCTOBER 5.2022 - ADDENDUM # 5 <br />PROJECT NO. 2154 <br />Item • <br />Description <br />oly, <br />UoM. <br />Unit Cost <br />Total Cost <br />SIT E RELATED. <br />SCOPE <br />1.01 <br />Not Used <br />$ <br />2.01 Isite <br />clearing (Sod, landscape, tree removal) <br />350 <br />SF 114 <br />$ 4900 <br />' <br />4900 <br />3.01 <br />Tree protection <br />1 <br />LS <br />600 <br />$ 600 <br />3.02 <br />New sod (by City) <br />SF <br />$ <br />3.03 <br />New landscaping (by City) <br />LS <br />$ <br />3.04 <br />Miscellaneous site work and underground utilities <br />1 <br />LS <br />13000 <br />$ 3000 <br />rAL <br />3600 <br />i- <br />XUSS <br />SITE - SUBTOTAL�Q <br />REAC'H <br />BUILDING <br />2.01 <br />Roof removal <br />400 <br />SF <br />18 <br />$ 7200 <br />2.02 <br />Masonry wall removal <br />350 <br />LS <br />28 <br />$ 9800 <br />2.03 <br />Wall and floor the removal <br />400 <br />SF <br />15 <br />$ 6000 <br />2.04 <br />Misc, demo <br />1 <br />LS <br />1500 <br />$ 1500 <br />2.05 <br />Concrete removal <br />25 <br />SF <br />35 <br />$ 875 <br />2.06 <br />Wood framing removal <br />25 <br />SF <br />35 <br />$ 875 <br />2.07 <br />Plumbing fixture removal <br />1 <br />LS <br />800 <br />$ 800 <br />27050 <br />3.01 <br />si <br />New concrete floor slabs <br />25 <br />SF <br />240 <br />$ 6000 <br />3.02 <br />New concrete beams 18"x12" reinf- <br />150 <br />LF <br />260 <br />$ 39000 <br />3.03 <br />Iwall reinforcement / filled cells <br />1 <br />LS <br />22000 <br />$ 22000 <br />- - <br />67 100 <br />ee <br />4.01 <br />■ <br />Masonry walls - 8" thick <br />220 <br />SF <br />20 <br />$ 4400 <br />4400 <br />5.02 <br />Standing seam steel roof panels <br />575 <br />1 SF <br />35 <br />$ 20125 <br />20125 <br />6.01 <br />Prefabricated wood trusses <br />LS <br />24000 <br />$ 24000 <br />24000 <br />7.01 <br />JiRoof underlayment <br />575 <br />1 SF <br />115 <br />$ 8625 <br />7.02 <br />IlInsulation - Walls/roof <br />400 <br />SF <br />10 <br />$ 4000 <br />LM <br />12625 <br />r - <br />__ . 4 <br />8.01 <br />Precast vent blocks <br />19 <br />EA <br />700 <br />$ 13300 <br />8.03 <br />New single doors - metal w/ hollow metal frame (36" x 84") <br />1 3 <br />EA <br />12500 <br />$ 7500 <br />20800 <br />9.01 <br />Interior plaster/stucco <br />225 <br />SF <br />22 <br />$ 4950 <br />9.02 <br />Epoxy painting (flooring) <br />400 <br />SF <br />5 <br />$ 2000 <br />9.03 <br />Architectural finishes / stucco accessories <br />1 <br />LS <br />2000 <br />$ 2000 <br />9.04 <br />New stucco <br />1,000 <br />SF <br />22 <br />$ 22000 <br />9.05 <br />Exterior painting <br />1,000 <br />SF <br />3,2 <br />$ ��[] <br />9.06 <br />Interiorpainfing <br />400 <br />SF <br />3 <br />$ 1200 <br />9.07 <br />Interior painting - doors and frames (spray doors only) <br />3 <br />EA <br />1300 <br />$ 900 <br />9.08 <br />Wall the - Restrooms <br />425 <br />SF <br />125 <br />$ 10625 <br />Turner Tech Agriculture Building Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.