Laserfiche WebLink
,,IV or <br />BILL LONE BEACH-.. <br />3J7 J�J A�� � <br />the d 7.qh' q i"F <br />EI D PRICE SHEET - OCTOBER 5,2022 - ADDENDUM # 5 <br />PROJECT NO. 2154 <br />DescriptionItem No. <br />SITE RELATED SCOPE <br />., _ <br />1.01 Not Used <br />T <br />RAS <br />--•. <br />$ <br />46 <br />2.01 <br />Isite clearing (Sod, landscape, tree removal) <br />350 <br />SF <br />$ <br />3.01 <br />ITree protection <br />1 <br />LS <br />$ <br />3.02 <br />New sod (by City) <br />SF <br />$ <br />3.03 <br />New landscaping (by City) <br />LS <br />$ <br />3.04 <br />BEACH ACCESS <br />00 <br />2.01 <br />Miscellaneous site work and underground utilities <br />131-JILDING <br />EXIST I NG.00 a INS I 11EMOLMON <br />Roof removal <br />I <br />400 <br />LS <br />SFJ <br />$ <br />$ <br />2.02 <br />Masonry wall removal <br />350 <br />LS <br />$ <br />2.03 <br />Wall and floor tile removal <br />400 <br />SF <br />$ <br />2.04 <br />Misc. demo <br />1 <br />LS <br />$ <br />2.05 <br />Concrete removal <br />25 <br />SF <br />$ <br />2.06 <br />Wood framing removal <br />25 <br />SF <br />$ <br />2.07 <br />Plumbing fixture removal <br />1 <br />LS P <br />$ <br />ii <br />3.01:967 <br />ete floor slabs <br />25 <br />SF <br />$ <br />3.02ete <br />beams J8"xl2") reinf. <br />150 <br />LF3.03cement <br />/ filled cells <br />I <br />LS <br />$ <br />4.01 <br />Masonry walls - 8- [hick <br />220 <br />SF <br />$ <br />e� <br />5.02 <br />Standing seam steel roof panels <br />575 <br />SF <br />$ <br />6.01 <br />Prefabricated wood trusses <br />1 <br />LS <br />$ <br />7.01 <br />Roof underlayment <br />575 <br />SF <br />$ <br />7.02 <br />Insulation - Walls/roof <br />400 <br />SF <br />$ <br />8.01 <br />Precast vent blocks <br />19 <br />EA <br />$ <br />8.03 <br />New single doors - metal w/ hollow metal frame (36" x 84") <br />3 <br />EA <br />$ <br />SPP <br />9.01 <br />1 <br />Interior plaster/stucco <br />225 <br />SF <br />$ <br />9.02 <br />Epoxy painting (flooring) <br />400 <br />SF <br />$ <br />9.03 <br />Architectural finishes / stucco accessories <br />I <br />LS <br />$ <br />9.04 <br />New stucco <br />1,000 <br />SF <br />$ <br />9.05 <br />Exterior painting <br />1,000 <br />SF <br />$ <br />9.06 <br />Interior pointing <br />400 <br />SF <br />$ - <br />9.07 <br />Interior painting - doors and frames (spray doors only) <br />3 <br />EA <br />$ <br />9.08 <br />Wall tile - Restrooms <br />425 <br />SF <br />$ <br />Turner Tech Agriculture Building Page 1 <br />