Laserfiche WebLink
accordance with City's written instructions, either correct such defective Work, or, if it has been <br />rejected by City, remove it from the site and replace it with non -defective Work. If Contractor <br />does not promptly comply with the terms of such instructions, or in an emergency where delay <br />would cause serious risk of loss or damage, City may have the defective Work corrected or the <br />rejected Work removed and replaced, and all direct, indirect and consequential costs of such <br />removalandreplacement (including but not limited to fees and charges of engineers, <br />architects, attorneys and other professionals) will be promptly paid by Contractor. Nothing in <br />this ITB or the Contract shall be construed as a limitation on any right or remedy for breach of <br />the Contract or defects in the Work. All rights set forth herein and in the Contract shall be <br />deemed cumulative and in addition to any rights or remedies which may be afforded by Florida <br />law. <br />