My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Okabrema
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(22-09-02) Re-Bid Renovations to the William "Bill" Lone Restroom Facility
>
Responses
>
Okabrema
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2022 3:53:25 PM
Creation date
10/17/2022 3:52:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Octavio Maniglia <br />6708 San Vicente St, Coral Gables. FL33146 /omanigliara�okabrema.us. Mobile: (305)498-6680 <br />Professional Experience <br />AHS Residential Miami,FL <br />AHS at Coral Reef (175 Rental Units, 170,000 sqft, valued at 24.5 M) 2019- Present <br />Villas at Pine Grove (204 Rental Units, 193,800 sqft, valued at 22.5 M) <br />Landings at Tamiami (264 Rental Units, 187,824 sqft, valued at 32 M) <br />Banyan Ridge (228 Rental Units, 176,700 sqft, valued at 31 M) <br />Shell Project Manager <br />• Coordinate and supervise all shell related daily operations along with each project construction team. <br />• Budget control & analysis along with cost control department for ongoing and under development projects. <br />• Monitor and adjust schedule per phasing, logistics or pour sequence changes during construction. <br />• Develop and review subcontractor scope of work, analyze and accept subcontractor proposal for best value. <br />• Subcontractors Risk Management assessment, Letters of Intent, contract negotiations & awarded. <br />• Review and approved subcontractors changes orders & application of payments. <br />• Promote and implement all required safety measures from start to finish on each project. <br />• Promote highest quality levels throughout the entire construction process. <br />• Generate and reconciled all shell related purchase orders. <br />• Review and approved all shell related suppliers and vendors invoices. <br />• Value engineer input during design & construction phases. <br />COASTAL Construction Miami, FL <br />Merrick Park Hotel (147 Hotel Rooms, 157,359 sqft, valued at 50 M). 2018-2019 <br />Mimo Bay Apartments (267 Units, 428,673 sqft, valued at 60 M). <br />Assistant Project Manager <br />• Develop and review subcontractor scope of work, analyze and accept subcontractor proposal <br />for best value. <br />• Subcontractors Risk Management assessment, Letters of Intent, contract negotiations & <br />awarded. <br />• Review & approved subcontractors changes orders & application of payments. <br />• Monitor & balance project budget. <br />MCM Construction Management Ft Lauderdale, FL <br />FLLT4 Airport Eastern Expansion (204,617 sqft, valued at 120 M). 2016-2018 <br />Change Manager <br />• Prepare and review estimates of material, labor, equipment, subcontracts, construction facilities, etc. <br />• Foster relationships with subcontractors and suppliers. <br />• Develop and review subcontractor scope of work, analyze and accept subcontractor quotes for best value. <br />• Present cost estimates to meet customer proposals, providing consideration for general and special <br />conditions. <br />Superintendent <br />• Responsible for: Plan, coordinate, direct, and supervise personnel, subcontractors, and vendors engaged to <br />ensure completion of Zone A,B & C ( T-4/ G1 -G6 Passenger Boarding Bridge) areas work on time, within <br />budget and to the quality specified. <br />OKABREMA Corp Miami, FL <br />
The URL can be used to link to this page
Your browser does not support the video tag.