Laserfiche WebLink
7.01 <br />1 Roof undedayment <br />575 <br />SF <br />117.39 <br />1 $ 10,000.00 <br />7.02 <br />8.01 <br />llnsulation - Walls/roof <br />• <br />Precast vent blocks <br />400 1---LF--J <br />19 1 <br />EA <br />37,5 <br />SUBTOTAL <br />11,315.78 <br />$ 1 5 000.00 <br />1 $ 25,000:00 <br />8.03 <br />9 oo <br />9.01 <br />New single doors - metal w/ hollow metal frame (36' x 84") <br />FINISHES <br />Interior plaster/stucco <br />3 <br />225PF44.44 <br />EA <br />12,166.67 <br />:SUBTOTAL <br />1 $ 0,50100 <br />$ 10,000,00 <br />9.02 <br />Epoxy painting (flooring) <br />40016,25 <br />$6,500,00 <br />9.03 <br />Architectural finishes / stucco accessories <br />1 <br />2 500,00 <br />$ 2,500,00 <br />9.04 <br />New stucco <br />1,00015,00 <br />$ 15,000.00 <br />9.05 <br />Exterior painting <br />1,00015.00 <br />$ 15.000,00 <br />9.06 <br />lInterior painting <br />400 <br />SF <br />8,75 <br />$3,500,00 <br />9.07 <br />Interior painting - doors and frames (spray doors only) <br />3 <br />EA <br />500.00 <br />$ 1,500.00 <br />9.08 <br />Wall tile - Restrooms <br />425 1 <br />SF <br />135.29 <br />$ 15.000.Oo <br />Turner Tech Agriculture Building Page 1 <br />