My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3401
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 10:31:23 AM
Creation date
10/18/2022 11:39:02 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3401
Date (mm/dd/yyyy)
09/15/2022
Description
First Amend w/Keith & Assoc. for TCP Meditation Garden Upgrades
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 6, 2022 / Page 6 of 8 <br />11723.04 — Town Center Park Upgrades <br />City of Sunny Isles Beach <br />2. KEITH will develop a table including basic tabulations and calculations for tree removal <br />and mitigation as required by local jurisdiction. <br />NOTE: It is assumed that no arborist reports will be required for this project. If requested, a <br />contract addendum will be submitted to the CLIENT. * <br />Task 703 Landscape Construction Documents <br />Based on the approved Design Development phase, KEITH will develop the construction documents <br />in coordination with the overall design team and CLIENT. The drawings will be developed in a 60% <br />or preliminary documentation for review and coordination, as well as a final for Permit or 100% <br />Construction Documentation. <br />Deliverables <br />1. Construction Documents (60% and Final Construction Documents) <br />a. Hardscape & Layout Plan — Material type and layout. <br />Note — as noted by the CLIENT, the water feature and commissioned art/sculpture <br />per the conceptual plan are by others and therefore not included in this scope of <br />work. <br />b. Sitework Details — General details and section/elevations for character and project <br />understanding - All structural engineering by others and not included in this proposal. <br />c. Landscape Plan and Details — Specific elements, specification, quantity, layout, notes <br />and details. <br />d. Tree Disposition Plan (per Task 702) — updated as required. <br />e. Irrigation Plans and Details — Point of connection, head layout, piping, equipment <br />schedule and details. <br />f. Site Furniture — Furniture layouts and specific catalog cuts and material selections. <br />2. Specifications — For above referenced Design Elements (specifications will be included <br />in the plan sheets). <br />3. Meetings and Team Coordination — During the specified duration in the project schedule, <br />KEITH will attend all required meetings and coordination. It is assumed all meetings will <br />be in South Florida <br />NOTE: This task includes one (1) drawing revision (after the release of 100% Construction <br />Drawings) in response to City comments. If additional revisions are required as a result of CLIENT <br />and/or Design Team changes, a contract addendum will be submitted to the CLIENT. * <br />CONSTRUCTION / PROJECT MANAGEMENT SERVICES <br />Construction / Project Management Services are not included in this scope of work. If required, the <br />CONSULTANT will be pleased to provide additional services under a separate agreement. <br />Engineering Inspired Design. 371 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.