Laserfiche WebLink
-PROPOSAL 438 - 10/17/2022 <br />Description Quantity Rate Amount <br />1 $75,200.00 $75,200.00' <br />MECHANICAL LOBBY <br />Relocate new AC duct as per plans <br />Relocate new ac linear diffuser as per plans <br />Provide and install new AC return as per plans <br />1 $78,500.00 $78,500.00' <br />PLUMBING: <br />Install new toilets in new restrooms <br />Install new sink in new restrooms <br />New drain in new restrooms <br />Relocate under ground drain on new bar <br />Relocate above ground drain on new bar <br />Relocate hot and could water for new bar. <br />FRAME/DRYWALL/FINISH: 1 $235,000.00 $235,000.00* <br />Create new metal frame on all ceiling <br />Repair any damage metal frame on restrooms <br />Repair any damage frame on partitions <br />Install new drywall on new frame and restrooms. <br />Creta new soffits as per plans on ceiling <br />Create new partitions as plans. <br />Drywall finish on new walls and ceiling. _ <br />**{All metal frame will be 20 gage <br />All drywall on wet area will be mold resistant <br />1 $15,200.00 $15,200.00* <br />FLOOR TILE: <br />Install new the on all floor except kitchen area. All settings material included on this price (Thin set <br />Laticrete 253 and mortar mix) <br />1 $25,500.00 $25,500.00* <br />RESTROOMS TILE: <br />Provide labor and material to install the at Restrooms wall and floor. Setting material thin set Laticrete <br />253 and mart mix included on price. <br />1 $5,500.00 $5,500.00* <br />TILE BASEBOARD: <br />Provide labor and material to install the at all permiter• walls where is need it .Setting material thin set <br />Laticrete 253. <br />2/4 <br />