Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />e) Releases and waivers of lien from all Subcontractors of the Contractor and of any and <br />all other parties required by the City's Representative or the City. <br />f) Consent of surety to final payment. <br />g) A duly executed assignment of any and all warranties required by the Contract <br />Documents. <br />h) Any and all operating manuals required by the Contract Documents. <br />i) Any and all manuals relating to Project materials or Project maintenance. <br />j) Executed change orders relating to any and all changes in the Work. <br />k) Any and all as -built drawings required by the Contract Documents. <br />If any third party fails or refuses to provide a release of claim or waiver of lien as required <br />by the City, the Contractor shall furnish a bond satisfactory to the City to discharge any such <br />lien or indemnify the City from liability. <br />5.4.3 As a further condition precedent to final payment, the Contractor shall furnish <br />to the City a complete and comprehensive set of as -built drawings; said as -built drawings are <br />to be submitted in hard copy and in electronic format, and the City and the Contractor agree <br />and acknowledge that the Contract Price includes all cost and expense associated with the <br />production of said as -built drawings. <br />5.4.4 The City shall make final payment of all sums due the Contractor within twenty- <br />five (25) days of the City's Representative's execution of a final Certificate for Payment. <br />5.4.5. Acceptance of final payment shall constitute a waiver of all claims <br />against the City by the Contractor except for those claims previously made in writing against <br />the City by the Contractor, pending at the time of final payment, and identified in writing by <br />the Contractor as unsettled at the time of its request for final payment. <br />ARTICLE VI <br />THE CITY <br />6.1 Information. Services and Items Required from City <br />6.1.1 The "City" The City of Sunny Isles Beach, as represented by the City <br />Commission and its designees, which is the owner of this Project. <br />6.1.2 The City shall furnish to the Contractor, prior to execution of this Contract, <br />any and all written and tangible material in its possession concerning conditions below <br />ground at the site of the Project. Such written and tangible material is furnished to the <br />Contractor only in order to make complete disclosure of such material and for no other <br />purpose. <br />By furnishing such material, the City does not represent, warrant, or guarantee its accuracy <br />either in whole, in part, implicitly or explicitly, or at all, and shall have no liability <br />therefore. The City shall also furnish surveys, legal limitations and utility locations (if <br />known), and a legal description, if available, of the Project site. <br />ii <br />