Laserfiche WebLink
Page 9 of 9 <br />11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) <br />City of Sunny Isles Beach <br />Table 2 Budget Estimate of Engineering Services <br />TASK <br />FEE <br />Task 103 — Additional Boundaryand Topographic Surve Y <br />$7,500(Lump Sum <br />Task 104 — Additional Existing Easement Research (By <br />Subconsultant - Paramount Title Services) — Optional <br />Services <br />$1,350 (Lump Sum) <br />Task 202 — Additional Geotechnical Testing and Reporting (By <br />Geotechnical Sub. - NV5) <br />$2,400 (Lump Sum) <br />Task 302 — Conceptual Site Plan <br />$8,500(Lump Sum <br />Task 303 — Additional Site Plan Preparation and Processing <br />$5,500(Lump Sum <br />Task 404 — Additional Preliminary Engineering / Design <br />Development Plans <br />$3,500 (Lump Sum) <br />Task 405 —Additional Engineering Construction Documents <br />$4,200(Lump Sum <br />Task 406 —Additional Engineering Permitting <br />$3,500(Lump Sum <br />Task 502 — Additional Electrical Construction Documents (CD) (By <br />Electrical Sub. - SGM) <br />$2,500 (Lump Sum) <br />Task 601 — Environmental Consulting & Permitting Services (By <br />Environmental Subconsultant) <br />$30,000 (Lump Sum) <br />Task 704 — Additional Landscape Design Development Plans <br />$3,800(Lump Sum <br />Task 705 — Additional Tree Inventory and Appraisal by <br />Certified Arborist <br />$2,200 (Lump Sum) <br />Task 706 — Additional Landscape Construction Documents <br />$7,000(Lump Sum <br />CONSULTANT'S TOTAL COMPENSATION <br />$81,950 (Lump Sum) <br />DIRECT EXPENSES / REIMBURSABLES <br />$1,000 (Time and Materials) <br />TOTAL FEE <br />$82,950 <br />"CITY": <br />CITY OF SUNNY ISLES BEACH <br />CONSULTANT: <br />KEITH <br />By: By: <br />ALEX LAZOWICK <br />President <br />Engineering Inspired Design. 143 <br />1 <br />