Laserfiche WebLink
mapping, LED walls and structures, custom sound design, digital media creation, and interactive <br />design. Our activation and installation department can work with you from inception with a site <br />survey and consultation to determine the best approach for meeting your goals. Our safety - <br />trained installation experts are fully insured and certified. We offer nationwide bespoke <br />hardware and tailored solutions to fit your environments and site conditions, including ongoing <br />maintenance and removal. <br />f. Contingency plans in the event of emergency or disaster: <br />A3 has back-up printers in the Miami area that we work with as well as our headquarters in LA in <br />case of a full shutdown of our local facility. <br />The A3 team follows all OSHA Safety Guidelines. For example, OSHA Rules prohibits the use of <br />Ariel buckets 15 feet above ground level when sustained winds speeds are in excess of 30 MPH. <br />Due to OSHA regulations if light pole banners are required to be removed in the face of a <br />potential hurricane A3 Visual Safety Policy is that all removal requests must be established no <br />later than 72 hours in advance of the issuance of a Hurricane Watch. <br />A3 Visual will begin removal on a first request basis, and we will work if we possibly can. We <br />must allow our employees to secure their homes and families and evacuate if necessary. Any <br />loss of Signage, Banners and/or Brackets in a tropical storm or Hurricane is an Act of God and <br />not covered by AAA Flag and Banner d/b/a A3 Visual insurance. <br />