Laserfiche WebLink
<br />City of Sunny Isles Beach |Invitation to Bid No. 23-02-01 17 <br /> <br />and building code requirements applicable to the work contemplated herein. Damages, penalties <br />and or fines imposed on the City or the Contractor for failure to obtain required licenses, permits <br />or fines shall be borne by the Contractor. Contractor shall be required to furnish a certified copy <br />of all licenses, certificates of competency or other licensure requirements necessary to practice <br />his profession as required by Florida Statutes, Florida Building Code, Miami-Dade County, or City <br />of Sunny Isles Beach Code. These documents shall be furnished to the City along with the Bid <br />response. Failure to furnish these documents or to have required licensure will be grounds for <br />rejecting the Bid as non-responsive or otherwise. <br /> <br />Contractor shall always have a copy of approved permit and associated plans on the jobsite. It is <br />the Contractor’s responsibility to coordinate notice of commencement, and coordinate with the <br />permitting authority having jurisdiction on any requirements given as a conditional approval of the <br />permitting. <br />Pursuant to Florida Statute Section 218.80, the City hereby discloses that the following licenses, <br />permit and fees and their costs are issued by the City for construction. Licenses, permits and fees <br />applicable to this Project are within the link found below and must be obtained and/or paid by <br />the awarded Bidder. The successful Bidder is responsible to identify and obtain all applicable <br />licenses, permit and pay all such related fees. The costs of all licenses permits and their respective <br />fees applicable to this Project are to be secured and paid for by the awarded Bidder. <br /> <br /> Click here to view the permit fee schedule. <br /> <br />2.15 LABOR, MATERIALS, AND EQUIPMENT SHALL BE SUPPLIED BY THE CONTRACTOR <br /> <br />The Contractor shall furnish the following, including but not limited to, all labor, material, equipment, <br />barricading, Maintenance of Traffic (MOT) inclusive of any required off duty police officers, adequate <br />supervision, and coordination for satisfactory contract performance. When not specifically identified in the <br />technical specifications, such materials and equipment shall be of a suitable type and grade for the purpose <br />and meeting or exceeding all permit or industry standard requirements. All material, workmanship, 100% <br />design, testing and equipment shall be subject to the inspection and approval of the City Manager or his <br />designated representative for this project. <br /> <br />2.16 ACCIDENT PREVENTION AND BARRICADES <br />Barricades, cones, construction fencing, temporary construction fencing and off duty police officers, per <br />City regulations and other relevant requirements, shall be provided by the Contractor when work is <br />performed in areas traversed by persons, vehicular traffic or when deemed necessary by the City Manager <br />at no extra cost to the City. CONTINUOUS OFF-DUTY POLICE SUPPORT SHALL BE REQUIRED FOR ALL WORK <br />RESULTING IN MODIFICATIONS TO THE EXISTING TRAFFIC FLOW PATTERNS INCLUDING BUT NOT LIMITED <br />TO LANE CLOSURES AND DETOURS OR WHERE OTHERWISE REQUESTED BY THE CITY. <br />