Laserfiche WebLink
ITB # 23-02-01 <br />172nd Street Roadway and Drainage Improvements <br />Description Quantity Unit Unit Price Total Price <br />GENERAL CONDITIONS/CONTRACT ADMINISTRATION (INSURANCE/INDEMNIFICATION)1 LS <br />CONSTRUCTION SURTEY BOND 1 LS <br />MOBILIZATION / DEMOBILIZATION 1 LS <br />NEW CURB TYPE "D"101 LF <br />NEW CURB AND GUTTER TYPE "F" 725 LF <br />CONSTRUCTING NEW 4" THICK SIDEWALK TO MATCH EXISTING 3558 SF <br />CONSTRUCTING BRICKS RISING UP TO NEW RIMS BOTTOM ELEVATION 3 EACH <br />POLLUTION CONTROL STRUCTURES 3 EACH <br />EXIST. ASPHALT TO BE RESURFACED ALONG CITY PARK PROPERTY LIMITS WITH 1" <br />TYPE S-III ASPHALT W/ 1-1" LIFTS (AS SHOWN ON APPROVED PLANS)7790 SF <br />REMOVE EXISTING ASPHALT AND REPLACE WITH 98% COMPACTED LIMEROCK BASE <br />AND 4" TYPE S-III ASPHALT W/ 2-2" LIFTS (AS SHOWN ON APPROVED PLANS)12806 SF <br />REMOVE EXISTING ASPHALT AND REPLACE WITH 98% COMPACTED LIMEROCK BASE <br />AND 1" TYPE S-III ASPHALT W/ 1-1" LIFTS 1177 SF <br />EXCAVATION FOR REMOVAL OF EXISTING DRAINAGE PIPE RCP 360 LF <br />FOR RESTORATION SODDED AREA 2693 SF <br />24" RCP 26 LF <br />TOP RIM ADJUSTMENT FOR WATER VALVES, METER BOXES, ETC.6 EACH <br />TOP RIM ADJUSTMENT FOR SEWER STRUCTURES 3 EACH <br />TOP RIM ADJUSTMENT FOR DRAINAGE STRUCTURES 4 EACH <br />TOP RIM ADJUSTMENT FOR OTHERS UTILITIES (GAS, ELECT, ETC.)4 EACH <br />4" SINGLE WHITE PAINT (TYPICAL)220 LF <br />6" SINGLE WHITE THERMOPLASTIC (WITHIN THE R/W)835 LF <br />6" DOUBLE YELLOW PAINT (TYPICAL)31 LF <br />6" DOUBLE YELLOW THERMOPLASTIC (WITHIN THE R/W)720 LF <br />24" WHITE PAINT (TYP)35 LF <br />PAVEMENT MESSAGE WHITE PAINT (TYP) FDOT INDEX No. 711-001(6'-4" X 8' TYP.)2 EACH <br />PAVEMENT MESSAGE FDOT INDEX No. 711-001(6'-4" X 8' TYP.)6 EACH <br />HANDICAP BLUE PAINT 18 LF <br />HANDICAP BLUE PAINT LOGO 1 EACH <br />HANDICAP WHITE PAINT 274 LF <br />Furnishing traffic control 1 Aggregate <br />Sum <br />Overhead and profit 1 Aggregate <br />Sum <br />SUBTOTAL $ <br />Providing uniformed, off-dutty police officers for the purpose of maintenance of traffic 1 Aggregate <br />Sum N/A 60,000.00$ <br />Cost of required permits, fees, inspections, impact fees, if authorize by the Engineer (3% of <br />Subtotal)1 Dedicated <br />Allowance N/A <br />Grand Total $ <br />Notes: <br />1. Quantities and structure types are subject to change based on final design and/or permitting effort. <br />2. Unit prices shall include all labor, materials, equipment, transportation, supervision representing an in-place price for each item. <br />Road, Drainage, Sidewalk & Pavement Markings <br />Signature, I hereby attest that I have the authority to sign this notarized certification and <br />certify that the above referenced information is true, complete and correct.