My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB #23-03-01 JOINT PROCUREMENT CENTRAL ISLAND DRAINAGE
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-03-01) SIB Central Isalnd Drainage Improvements & City of N Miami Beach Distribution System Watermain Replacements
>
ITB #23-03-01 JOINT PROCUREMENT CENTRAL ISLAND DRAINAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2023 3:46:03 PM
Creation date
3/27/2023 3:42:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach & City of North Miami Beach| Drainage Improvements & Watermain <br />Replacement 22 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />2.28 CITY ENGINEER <br /> <br />All communications and correspondence shall be directed to the City Engineer and appointed project <br />manager. The supervision of the execution of this Contract is vested in the Engineer, the Construction <br />Manager and their instructions shall be carried into effect promptly and efficiently. The Engineer shall in all <br />cases determine the amount, quality, fitness and acceptability of the work and materials to be paid for and <br />shall decide finally and conclusively all questions or differences of opinion that may arise as to the <br />interpretation of the Plans and Specifications or the fulfillment of the terms of the Contract. In the event of <br />such a question or difference of opinion, the decision of the Engineer is to be a condition precedent to the <br />Contractor’s right to receive any money for the work or the materials to which the question or difference <br />of opinion relates. <br /> <br />If the Contractor considers any work demanded of him/her to be outside the requirements of the Contract, <br />or if they consider any decision or ruling of the Engineer to be unfair, they shall immediately, upon such <br />work being demanded or ruling or decision being made, shall ask for written instructions or decisions from <br />the Construction Manager, whereupon they shall proceed without delay to perform the work or conform <br />to the decision or ruling. Beginning with the first day of this work, the Contractor and the Inspector shall fill <br />out daily Time and Material Records for the work. Such records shall be signed by both parties. This <br />documentation does not constitute acknowledgement for authorization to pay for this work. In the event <br />that a claim for this work is approved by the City subsequent to the commencement of the work an accurate <br />accounting of work shall be agreed upon by both parties upon completion of this work and will be paid for <br />as work as provided in the Specifications by Allowance Account if funds are available, or by an approved <br />Change Order by the Board of Commissioners. <br /> <br />2.29 WARRANTY SHALL BE SUPPLIED IN WRITTEN FORM <br />In addition to any manufacturer’s warranties, Contractor warrants and guarantees to the City that all <br />work will be in strict accordance with the Contract Documents and will not be defective. All defective <br />Work, whether or not in place, may be rejected, corrected, or accepted as provided below. <br />2.29.1 Correcting Defects Covered Under Warranty <br />The Contractor shall be responsible for promptly correcting any deficiency, at no cost to the City, <br />within seven (7) calendar days after the City notifies the Contractor of such deficiency in writing. <br />If the Contractor fails to satisfy the warranty within the period specified in the notice, the City may <br />(a) place the Contractor in default of its contract, and/or (b) procure the products or services from <br />another source and charge the Contractor for any additional costs that are incurred by the City for <br />this work or items; either through a credit memorandum or through invoicing. <br /> <br />2.29.2 Owner May Stop the Work <br /> <br />If the Work is defective or Contractor fails to supply sufficiently skilled workers or suitable <br />materials or equipment or fails to furnish or perform the Work in such a way that the completed <br />Work will strictly conform to the Contract Documents, City may order Contractor to stop the Work, <br />or any portion thereof, until the cause for such order has been eliminated. However, this right of <br />City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the <br />benefit of Contractor or any other party. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.