My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Stout Group, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-02-01) East End of 172nd St Rdway & Drainage Improvements
>
Responses
>
The Stout Group, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 11:16:55 AM
Creation date
4/4/2023 11:12:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clic of <br />��ytSL�S� <br />va :mss►- ._ 2 <br />rte Hrigt[ a{l;nng <br />ADDENDUM #5 <br />DATE: WEDNESDAY, MARCH 22, 2023 <br />TO: ALL PLANHOLDERS <br />FROM: PURCHASING MANAGER <br />BID NO.: INVITATION TO BID 23-02-01 EAST END OF 172ND STREET ROADWAY AND DRAINAGE <br />IMPROVEMENTS <br />SUBJECT: ADDENDUM NO. 5 <br />Bidder must attach this addendum to the documents in your possession and include the <br />Acknowledgement of Addenda form with your response incorporated with your firm's bid. <br />Q1. There is a "POLLUTION CONTROL STRUCTURES" item on the bid form but there are no new <br />drainage structures in the plans and the are no baffles or weirs shown either. Can you define <br />what this bid item is for? <br />Al. Changed to erosion control protection of inlets. <br />Q2. It appears that bid form accounts for drainage structure modifications on multiple line <br />items. The first is "CONSTRUCTING BRICKS RISING UP TO NEW RIMS BOTTOM ELEVATION" and <br />the second is "TOP RIM ADJUSTMENT FOR DRAINAGE STRUCTURES". Can you explain the <br />difference between these two bid items? <br />A2. Changed to only 1 for adjustments. <br />Q3. Addendum 1 informed bidders to use "REMOVE EXISTING ASPHALT AND REPLACE WITH <br />98% COMPACTED LIMEROCK BASE AND 4" TYPE S -III ASPHALT W/ 2-2" LIFTS (AS SHOWN ON <br />APPROVED PLANS)" for change to 2-1" Lifts (as shown on approved plans). I do not believe it is <br />proper to change a bid item in addenda and not make change to bid form. Can you modify bid <br />form to match the addendum? <br />A3. Please refer to addendum #4. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.