My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Stout Group, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-02-01) East End of 172nd St Rdway & Drainage Improvements
>
Responses
>
The Stout Group, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 11:16:55 AM
Creation date
4/4/2023 11:12:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE STOUT IF LLC. <br />9. Florida Department of Transportation—T6401— Biscayne Blvd Roadway Improvements <br />a. Owner Name: Florida Department of Transportation <br />Contact Person: Jonathan Fundora —Construction Senior Project Manager <br />Phone Number: 305-962-3653 <br />Email Address: 'onathan.fundora@dot.state.fl.us <br />L Narrative: <br />On the aforementioned project, The Stout Group, LLC performed various scopes <br />within the project limits of Biscayne Blvd. The scopes self -performed included were <br />major drainage upgrades along the project corridor, water main upgrades, and sewer <br />main upgrades. The sewer main upgrades included bypassing sewer mains. Full <br />reconstruction of the roadway, concrete curb and gutter, concrete sidewalks, paver <br />sidewalks, lighting upgrades, full intersection signalization installation, pedestrian <br />signalization upgrades, milling and resurfacing, striping, and guardrail installation. <br />c. Contract Amount: $5,700,000.00 <br />d. Completion Date: 05/03/2019 <br />UNDERGROUND I SITEWORK 1 EARTHWORKS I PAVING <br />10850 NW 138th Street, Bay#3 - Hialeah Gardens, FL 33018 - O: 786.452.1481 - F: 305.397.2311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.