My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sleiman Bid Submittal signed
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-02-02) Town Center Park Meditation Garden
>
Responses
>
Sleiman Bid Submittal signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 8:18:48 AM
Creation date
4/6/2023 12:57:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town Center Park Meditation Garden - Bid Tabulation ITB 23-02-02 <br />ITEM DESCRIPTION OF UNIT TOTAL I UNIT $ TOTAL I NOTES <br />SITE W ORK <br />1 <br />General Conditions/Contract <br />LS <br />1 <br />90,340.8 <br />Administration (Insurance/ <br />7 <br />90,340.87 <br />Indemnification/Surety Bond) <br />$ <br />2 <br />Mobilization <br />LS <br />1 <br />5,357.66 <br />$ 5,357.66 <br />n accordance with FDOT Standard Specs. Approx. <br />10% <br />3 <br />LS <br />1 <br />Overhead and profit <br />106,900.00 <br />Is 106,900.00 <br />4 <br />Building Architectural Update <br />LS <br />1 <br />24,873.68 <br />$ 24,873.68 <br />5 <br />Cost of required permits, fees, <br />LS <br />1 <br />inspections, impact fees, if <br />authorize by the Engineer (3% of <br />22,000.00 <br />22,000.00 <br />Subtotal) <br />$ <br />6 <br />Erosion Control Measures/Best <br />1 <br />Management Practices <br />12,511.21 <br />12,511.21 <br />7 <br />Removal of Existing Concrete/Asphalt/Rock <br />Base and other existing elements) in <br />Limited Selective Clearing and <br />SY <br />1235 <br />2.68 <br />$ 3,309.80 <br />accordance with Demolition Plan and <br />Grubbing <br />Proposed Improvements <br />8 <br />Imported Selected Fill <br />CY <br />566 <br />48.22 <br />$27,292.52 <br />9 <br />Fine Site Grading <br />AC <br />0.30 <br />65,346.31 <br />Fine Grading within Project Limits <br />$19603.89 <br />3/4" PE Domestic Water Service <br />LF <br />180 <br />10 <br />with Connection & Trenching <br />41.67 <br />7,500.60 <br />11 <br />Temporary fencing and sidewalk <br />LS <br />1 <br />protection <br />13,394.1513,394.15 <br />$ <br />Sitework Subtotall <br />$ 333,084.38 <br />HARDSCAPE & SITE FURNISHINGS <br />12 <br />6" (Non-Reinforced) Concrete <br />SF <br />1970 <br />Sidewalk with Marble Chip <br />37.05 <br />$72,988.50 <br />13 <br />6' diameter, 2' height Concrete <br />Contractor to provide shop drawings <br />Pedestal for Art Scultpure <br />LS <br />1 <br />4,286.12 <br />4,286.12 <br />$ <br />showing final dimensions and reinforcing, <br />14 <br />Pavers with base <br />SF <br />2658 <br />20.39 <br />$ 54,196.62 <br />15 <br />Oolite Boulders <br />EA <br />14 <br />191.34 <br />$ 2,678.76 <br />16 <br />Benches <br />EA <br />10 <br />2,520.80 <br />$ 25,208.00 <br />17 <br />Trash Receptacles <br />EA <br />2 <br />11354.42 <br />$ 2,708.84 <br />18 <br />Drinking Water Fountain <br />EA <br />1 <br />8,840.15 <br />$ 8,840.15 <br />19 <br />Column Nature Screen <br />EA <br />4 <br />2,143.06 <br />$ 8,572.24 <br />LS <br />1 <br />Paint for Existing Overhead <br />Structure to remain - (60' x 60') <br />11,395.74 <br />11,395.74 <br />21 <br />LS <br />1 <br />Paint for Existing Overhead <br />Structure to remain - (46'x 37') <br />7,500.73 <br />7,500.73 <br />$ <br />22 <br />Shade Sail Fabric <br />LS <br />1 <br />14,058.97 <br />$14,058.97 <br />Hardscape & Site <br />Furnishings Subtotal <br />$212,434.67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.