My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sleiman Bid Submittal signed
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-02-02) Town Center Park Meditation Garden
>
Responses
>
Sleiman Bid Submittal signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 8:18:48 AM
Creation date
4/6/2023 12:57:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c� <br />SLEIMAN <br />\� CONSTRUCTION <br />Florida Certified General Contractor <br />CGC1529138 <br />Project Name: <br />Miami Dade College Building G HVAC Upgrade <br />Project Address: <br />500 College Terrace, Homestead, FL 33030 <br />Date of Completion: <br />September 2022 <br />Base Contract Amount: <br />$490,263.47 <br />Number and Amount of <br />Change Orders: <br />8 Change orders for a total addition of $ $59,049.40 <br />Contact name: <br />Ajeeth Adavalli <br />Contact Address: <br />1011 Sunnybrook Rd Ste 905, Miami FL 33136 <br />Contact Phone Number: <br />(405) 780-5730 <br />Project Description: <br />Upgrade entire HVAC of building G including new AHU, VAVs, ductwork, <br />and fume hoods. Sleiman Construction only performed the trades from <br />division 2 to division 9. <br />Project Name: <br />Baptist Health Emergency Care I Coral Way West <br />Date of Completion: <br />14591 SW 26th St, Miami, FL 33175 <br />Base Contract Amount: <br />$16,057,599.33 <br />Number and Amount of <br />10 change orders for a total deduction of ($2,144,399.57) due to Owner <br />Change Orders: <br />Direct Purchases <br />Contact name: <br />Chris Paredes <br />Contact Address: <br />9100 S Dadeland Blvd #600, Kendall, FL 33156 <br />Contact Phone Number: <br />(239) 253-3966 <br />Project Description: <br />The Emergency Center, which consist of 35,760 SF (Building Square <br />Footage), is built with cast in place slabs, columns and beams, fully grouted <br />CMU walls, precast joist, and stairs, and one steel structure canopy for drop- <br />off at the south side, and one steel structure canopy for ambulance at the <br />north side. There are two additional structures for the dumpster enclosure <br />and the generator enclosure, both with separate permits from the county. <br />The exterior finish of the building consists of stucco, aluminum metal <br />cladding, architectural precast panels, and curtain walls around the <br />perimeter. <br />There are two additional structures made of CMU and concrete for the <br />dumpster and the generator enclosure, both with separate permits from the <br />county. The building permit, along with the dumpster and generator <br />enclosures have been approved and pulled. <br />The site consists of a paved parking lot, with architectural landscape and <br />sidewalks. The property will have two entrances: one from the west side on <br />SW 145th Ave, and the other one on the south side in SW 26th St. <br />2801 NW 74th Ave, Suite 214, Miami, FL 33122 <br />(786)803-8575 <br />www.sleimanc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.