Laserfiche WebLink
Safewasw <br />SAFFTY•SFRVICF.RFSPANSF <br />mode -Z06 <br />A <br />- - -- -- - -- <br />- - - - -- - - - -- <br />- - - <br />-- <br />Fiber Optics LIU Connector Housing for field <br />E <br />CORNING <br />LIU <br />1 <br />1 <br />mount -Z06 <br />A <br />VMS NEMA ENCLOSURE PACKAGE(Includes: All <br />E <br />CUSTOM <br />CUSTOM <br />1 <br />1 <br />necessary Mounting Brackets)- large Form -Z06 <br />A <br />E <br />1- Channel of Net Video. -Z06 <br />A <br />VMS <br />314001 <br />8 <br />8 <br />E <br />WS- C2960S- <br />CISCO SWITCH `" -Z06 <br />Cisco <br />1 <br />1 <br />A <br />24T5 -L <br />CISCO SWITCH WITH GBIC MODULES -Z06 <br />A <br />Cisco <br />GBIC <br />4 <br />4 <br />THE <br />THE <br />FT <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />CABLING INFRASTRUCTURE- COPPER -Z06 <br />TEAM <br />TEAM <br />THE <br />THE <br />FT <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />CABLING INFRASTRUCTURE- FIBER OPTICS <br />TEAM <br />TEAM <br />THE <br />THE <br />4 <br />H <br />LABOR INSTALLATION, DEVICE MOUNTING, <br />SAFEWARE <br />SAFEWARE <br />0 <br />400 <br />R <br />PROGRAMMING AND SETUP -Z06 <br />TEAM <br />TEAM <br />0 <br />THE <br />THE <br />E <br />1 <br />SAFEWARE <br />SAFEWARE <br />15 <br />A <br />S <br />AS BUILTS DRAWINGS AND ENGINEERING -Z06 <br />TEAM <br />TEAM <br />THE <br />THE <br />E <br />4 <br />SAFEWARE <br />SAFEWARE <br />42 <br />A <br />2 <br />PROJECT MANAGEMENT -Z06 <br />TEAM <br />TEAM <br />THE <br />THE <br />E <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />A <br />MISCELLANEOUS COST- CONNECTORS, Boxes -Z06 <br />TEAM <br />TEAM <br />TOTAL COST OF PROJECT <br />$69,387.47 <br />