My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2264
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:54:41 PM
Creation date
8/7/2014 9:19:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2264
Date (mm/dd/yyyy)
07/17/2014
Description
Agmt w/Safeware Inc. to Install/Maintain Phase I of Citywide Security CCTV Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safewasw <br />SAFFTY•SFRVICF.RFSPANSF <br />mode -Z06 <br />A <br />- - -- -- - -- <br />- - - - -- - - - -- <br />- - - <br />-- <br />Fiber Optics LIU Connector Housing for field <br />E <br />CORNING <br />LIU <br />1 <br />1 <br />mount -Z06 <br />A <br />VMS NEMA ENCLOSURE PACKAGE(Includes: All <br />E <br />CUSTOM <br />CUSTOM <br />1 <br />1 <br />necessary Mounting Brackets)- large Form -Z06 <br />A <br />E <br />1- Channel of Net Video. -Z06 <br />A <br />VMS <br />314001 <br />8 <br />8 <br />E <br />WS- C2960S- <br />CISCO SWITCH `" -Z06 <br />Cisco <br />1 <br />1 <br />A <br />24T5 -L <br />CISCO SWITCH WITH GBIC MODULES -Z06 <br />A <br />Cisco <br />GBIC <br />4 <br />4 <br />THE <br />THE <br />FT <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />CABLING INFRASTRUCTURE- COPPER -Z06 <br />TEAM <br />TEAM <br />THE <br />THE <br />FT <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />CABLING INFRASTRUCTURE- FIBER OPTICS <br />TEAM <br />TEAM <br />THE <br />THE <br />4 <br />H <br />LABOR INSTALLATION, DEVICE MOUNTING, <br />SAFEWARE <br />SAFEWARE <br />0 <br />400 <br />R <br />PROGRAMMING AND SETUP -Z06 <br />TEAM <br />TEAM <br />0 <br />THE <br />THE <br />E <br />1 <br />SAFEWARE <br />SAFEWARE <br />15 <br />A <br />S <br />AS BUILTS DRAWINGS AND ENGINEERING -Z06 <br />TEAM <br />TEAM <br />THE <br />THE <br />E <br />4 <br />SAFEWARE <br />SAFEWARE <br />42 <br />A <br />2 <br />PROJECT MANAGEMENT -Z06 <br />TEAM <br />TEAM <br />THE <br />THE <br />E <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />A <br />MISCELLANEOUS COST- CONNECTORS, Boxes -Z06 <br />TEAM <br />TEAM <br />TOTAL COST OF PROJECT <br />$69,387.47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.