My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2264
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:54:41 PM
Creation date
8/7/2014 9:19:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2264
Date (mm/dd/yyyy)
07/17/2014
Description
Agmt w/Safeware Inc. to Install/Maintain Phase I of Citywide Security CCTV Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\ <br />,AFLTY0 = KVIGt•KL*1'U <br />bb <br />MOUNTING HARDWARE FOR AXIS CAMERA -Z07 <br />A AXIS <br />PMT 39 <br />39 <br />10 port High Temp field mounted POE switch 10 /100 8, 2 <br />E <br />LNP -1002- <br />10 /100 /1000 ports -Z07 <br />A <br />ANTARIA <br />GN <br />4 <br />4 <br />Power supply for POE switch -Z07 <br />E <br />ANTARIA <br />DRP -240- <br />4 <br />4 <br />A <br />40INC <br />SPF GBIC MODULE for field switch req. for multi mode- <br />E <br />ANTARIA <br />SNP -M <br />8 <br />I 8 <br />Z07 <br />A <br />Fiber Optics LIU Connector Housing for field mount -Z07 <br />EA <br />CORNING <br />LIU <br />1 <br />1 <br />VMS NEMA ENCLOSURE PACKAGE(Includes: All necessary <br />E <br />Mounting Brackets) -Z07 <br />A <br />Custom <br />Custom <br />2 <br />2 <br />E <br />VMS <br />314001 <br />39 <br />39 <br />1- Channel of Net Video. -Z07 <br />A <br />CONFIG. SERVER FOR RACK MOUNT APPLICATIONS- UP <br />E <br />VMS <br />90477 <br />1 <br />1 <br />TO 63 CHANNELS- 40 TB CONFIG. -Z07 <br />A <br />E <br />NITEK <br />IPP -TR12 <br />4 <br />4 <br />12 PORT SURGE SUPPRESION DEVICE -Z07 <br />A <br />WS- <br />CISCO SWITCH ** -Z07 <br />A <br />Cisco <br />C2960S- <br />5 <br />5 <br />24TS -L <br />CISCO SWITCH WITH GBIC MODULES -ZO7 <br />A <br />Cisco <br />GBIC <br />15 <br />15 <br />E <br />17" slide <br />KVM W /17" LCD MONITOR -Z07 <br />Tripplitte <br />1 <br />1 <br />A <br />tray <br />THE <br />THE <br />F <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />T <br />CABLING INFRASTRUCTURE- COPPER -Z07 <br />TEAM <br />TEAM <br />THE <br />THE <br />F <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />T <br />CABLING INFRASTRUCTURE- FIBER OPTICS -Z07 <br />TEAM <br />TEAM <br />THE <br />THE <br />H <br />13 <br />13 <br />LABOR INSTALLATION, DEVICE MOUNTING, <br />SAFEWARE <br />SAFEWARE <br />R <br />87 <br />87 <br />PROGRAMMING AND SETUP -Z07 <br />TEAM <br />TEAM <br />E <br />42 <br />42 <br />AS BUILTS DRAWINGS AND ENGINEERING -Z07 <br />A <br />E <br />15 <br />15 <br />PROJECT MANAGEMENT <br />A <br />2 <br />2 <br />E <br />1 <br />1 <br />MISCELLANEOUS COST - CONNECTORS, Boxes -Z07 <br />A <br />TOTAL COST OF PROJECT <br />$216,990.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.