My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2264
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:54:41 PM
Creation date
8/7/2014 9:19:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2264
Date (mm/dd/yyyy)
07/17/2014
Description
Agmt w/Safeware Inc. to Install/Maintain Phase I of Citywide Security CCTV Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safewaviv <br />SAFETY•SERV ICE•RESPANSE <br />Fiber Optics LIU Connector Housing for field mount -Z09 <br />A <br />CORNING <br />LIU <br />1 <br />1 <br />VMS NEMA ENCLOSURE PACKAGE(Includes: All necessary <br />E <br />CUSTOM <br />CUSTOM <br />1 <br />1 <br />Mounting Brackets)- large Form -Z09 <br />A <br />1- Channel of Net Video. -Z09 <br />A VMS <br />314001 <br />0 <br />10 <br />CONFIG. SERVER FOR FIELD MOUNTED APPLICATIONS- UP <br />E <br />VMS <br />980109 <br />2 <br />2 <br />TO 20 CHANNELS <br />A <br />THE <br />THE <br />F <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />T <br />CABLING INFRASTRUCTURE- COPPER -Z09 <br />TEAM <br />TEAM <br />LABOR INSTALLATION, DEVICE MOUNTING, HAND <br />THE <br />THE <br />6 <br />H <br />DIGGNING IN NECESSARY AREAS PROGRAMMING AND <br />SAFEWARE <br />SAFEWARE <br />6 <br />R <br />4 <br />4 <br />SETUP -Z09 <br />TEAM <br />TEAM <br />4 <br />THE <br />THE <br />E <br />3 <br />SAFEWARE <br />SAFEWARE <br />30 <br />A <br />0 <br />AS BUILTS DRAWINGS AND ENGINEERING -Z09 <br />TEAM <br />TEAM <br />THE <br />THE <br />1 <br />E <br />10 <br />SAFEWARE <br />SAFEWARE <br />0 <br />A <br />5 <br />5 <br />PROJECT MANAGEMENT -Z09 <br />TEAM <br />TEAM <br />5 <br />THE <br />THE <br />E <br />SAFEWARE <br />SAFEWARE <br />1 <br />1 <br />A <br />MISCELLANEOUS COST - CONNECTORS, Boxes -Z09 <br />TEAM <br />TEAM <br />TOTAL COST OF PROJECT <br />$135,821.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.