My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 23-05-02 GOLDEN SHORES PUMP STATION REHABILITATION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-05-02) Golden Shores Pump Station Rehabilitation
>
INVITATION TO BID 23-05-02 GOLDEN SHORES PUMP STATION REHABILITATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 4:58:45 PM
Creation date
5/19/2023 4:57:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />11 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />provisions included elsewhere in this solicitation and resultant contract. In addition to the written <br />NTP, the Contractor must supply the City with the required insurance and bond documents. The <br />project shall be substantially completed within one-hundred and eighty (180) calendar days from <br />the Project initiation specified in the Notice to Proceed and final completion shall be thirty (30) <br />calendar days after Substantial Completion. The total two-hundred and ten (210) calendar days <br />include weekend days and holidays. <br /> <br />For the purpose of this project, Final Completion shall be defined at that point after which the <br />City Engineer or their representative, have made and approved the Final Inspection and the Punch <br />List has been completed, and all deliverables have been provided to the City. <br /> <br />Failure to complete all the work within the time specified above, including any extension granted <br />in writing by the City, shall obligate the Contractor to pay the City, as liquidated damages and not <br />as a penalty, an amount equal to One thousand Dollars ($1,000) for each calendar day of delay <br />in the completion of all the work. If any liquidated damages are unpaid by the Contractor, the City <br />shall be entitled to deduct these unpaid liquidated damages from the monies due the Contractor. <br /> <br />2.6 METHOD OF AWARD <br /> <br />The term “lowest responsible and responsive Bidder” as used herein shall mean the Bidder whose <br />bid is the lowest of those Bidders possessing the skill, ability, and integrity necessary for the <br />faithful performance of the work, whose bid best serves the interests of and represents the best <br />value to the City, as determined by the City Commission and/or the City Manager. The bidder will <br />also be evaluated as part of their “responsibleness” on their quality control plan, safety plan, and <br />proposed project schedule. <br /> <br />Firms will be evaluated by relevant experience, preferably with government agencies, successful <br />past performance, no conflicts of interest, approach to the project, and whose bid best serves the <br />interest of and represents the best value to the City in conformity with the criteria set. The City <br />Manager may also reject all proposals received. Section 62-8 of the City Code provides that the <br />City may consider the following: <br /> <br /> The ability, capacity, and skill of the vendor to perform the Contract. <br /> The character, integrity, reputation, judgment, experience, and efficiency of the vendor. <br /> The quality of performance of previous contracts with the City and references. <br /> The previous and existing compliance by the vendor with laws and ordinances relating to <br />the Contract. <br /> <br />The City also reserves the right to waive minor variations to specifications (interpretation of minor <br />variations will be made by applicable City Procurement personnel). In addition, the City reserves <br />the right to cancel any contract by giving thirty (30) days written notice. The City reserves the right <br />to negotiate the type and cost of specific types of services to be purchased. <br /> <br />2.7 SUB-CONTRACTORS <br />
The URL can be used to link to this page
Your browser does not support the video tag.