My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 23-05-02 GOLDEN SHORES PUMP STATION REHABILITATION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-05-02) Golden Shores Pump Station Rehabilitation
>
INVITATION TO BID 23-05-02 GOLDEN SHORES PUMP STATION REHABILITATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 4:58:45 PM
Creation date
5/19/2023 4:57:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />9 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />Section 2 <br />Special Terms and Conditions <br /> <br />2.1 PURPOSE OF THE ITB <br /> <br />The City of Sunny Isles Beach (the "City"), a municipality located in Miami-Dade County, Florida, <br />is requesting bids from qualified Contractors (“Proposers”, “Bidders”, “Contractors”, or “Firms”) <br />to replace two (2) existing vertical storm pumps with two (2) new larger capacity vertical pumps, <br />to convert an existing generator room to house new pump controls, to install a new backup <br />generator, which will need to be powered by a new gas service line, on the north side of an existing <br />pumpstation building, to remove an existing bypass slide gate, to upgrade an existing building <br />façade, and reconstruct the adjoining parking area. The project location is 19200 North Bay Road <br />Sunny Isles Beach, FL 33160. <br /> <br />The scope of work shall be in accordance with the bid plans, as more particularly described in <br />Attachments B, C, D and E, as titled below: <br /> <br />ATTACHMENT B - TECHNICAL SPECIFICATIONS <br />ATTACHMENT C - GEOTECHNICAL REPORT <br />ATTACHMENT D - PLANS <br />ATTACHMENT E – GENERAL REQUIREMENTS <br /> <br />Ongoing station and generator maintenance will also be required. <br /> <br />Contractor shall, by careful examination, satisfy itself, to the extent it deems necessary, as to the <br />nature and location of the Work, the conformation of the ground and site, access and <br />transportation of materials, the character, quality and quantity of the materials, storage, handling <br />and disposal of materials, the character and storage of the equipment and facilities needed <br />preliminary to and during the prosecution of the Work, the availability, quantity, and quality of <br />labor, water, and electric power; availability and condition of roads; climatic conditions; location <br />of underground utilities; existing site conditions, topography and ground conditions; subsurface <br />geology, and hydrology, and nature and quantity of surface and subsurface materials to be <br />encountered; the general and local conditions and all other matters which can in any way affect <br />the performance of the Contract. <br /> <br />The budget for this project is $2,650,000. <br /> <br />Calvin Giordano & Associates is the City’s Consulting Engineer (“Engineer”), and shall serve as <br />agent for the City in all matters pertaining to the work on this project. No changes in the work or <br />extra charges to the Contract are effective until recommended by the City Engineer and approved <br />by the City in the form of a written change order. The Engineer is precluded from bidding on this <br />Project due to their involvement in the creation of the scope of work. <br /> <br />2.2 MINIMUM QUALIFICATION REQUIREMENTS (MQRS) <br /> <br />a. The Prime Contractor shall hold the proper license in the State of Florida to perform the
The URL can be used to link to this page
Your browser does not support the video tag.