My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2277
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2015 12:14:54 PM
Creation date
8/11/2014 4:02:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2277
Date (mm/dd/yyyy)
07/31/2014
Description
Agmt. w/Ric-Man International, Inc. for the Design and Construction of a Pedestrian Bridge at Gateway Park, Awd RFP No. 13-08-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR: <br />Rene L. Castillo Sr., President <br />RIC -MAN INTERNATIONAL, INC. <br />220 71s` Street, Suite 206 <br />Miami Beach, FL 33141 <br />COPY TO: <br />CITY: <br />Christopher J. Russo, City Manager <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />COPY TO: <br />Hans Ottinot, City Attorney <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />17.2 Computation of Time. <br />When any period of time is referred to in the Contract Documents by days, it will be <br />computed to exclude the first and include the last day of such period. If the last day of any such period <br />falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, <br />such day will be omitted from the computation. A calendar day of twenty four (24) hours measured <br />from midnight to the next midnight shall constitute a day. <br />17.3 Force Majeure. <br />Should any party fail to perform its obligations under this Agreement due to a <br />condition of force majeure, as that term is interpreted under Florida Law, and specifically including <br />but not limited to Acts of God (including hurricanes, tropical storms and/or very strong storms which <br />are anticipated by the Parties and taken into consideration when the CONTRACTOR agreed to the <br />substantial completion date) fire, flood, earthquakes, then the time for performance of said obligation <br />hereunder will be extended by a period reasonable commensurate with the cause of such failure to <br />perform or cure. If the Contractor is delayed in performing any obligation under this agreement due <br />to a force majeure condition, the CONTRACTOR shall request a time extension from the CITY <br />within ten (10) working days of said force majeure occurrence. Any time extension shall be subject <br />to mutual agreement and shall not be cause for any claim by the CONTRACTOR for extra <br />compensation. Events of force majeure do not include acts or omissions of sub - contractors. <br />ARTICLE 18 — MISCELLANEOUS <br />18.1 The duties and obligations imposed by the Contract Documents and the rights and <br />remedies available hereunder to the parties hereto, and, in particular but without limitation, the <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.