My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2277
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2015 12:14:54 PM
Creation date
8/11/2014 4:02:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2277
Date (mm/dd/yyyy)
07/31/2014
Description
Agmt. w/Ric-Man International, Inc. for the Design and Construction of a Pedestrian Bridge at Gateway Park, Awd RFP No. 13-08-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
completion of the entire Project as long as any additions and revisions do not materially deviate from <br />the information contained in City of Sunny Isles Beach RFP No. 13 -08 -01 Gateway Park Pedestrian <br />Access Improvements — Step 2 Technical Proposal. A portion of the GMP shall be attributed to the <br />design phase of the Project and the remainder attributed to the construction phase as further delineated <br />in the attached Exhibit "A" titled Schedule of Values, which is incorporated herein by reference. <br />1.15 Notice of Award - The written notice by CITY to the CONTRACTOR stating that the <br />CONTRACTOR is awarded the privilege to design and construct the Project on the condition that the <br />Parties are able to negotiate, to the CITY'S complete satisfaction, and execute an Agreement for the <br />design and construction of the entire Project. <br />1.16 Notice to Proceed - A written notice given by CITY to CONTRACTOR fixing the <br />date on which the Contract Time will commence to run and on which CONTRACTOR shall start the <br />design and construction phases under this Agreement. <br />1.17 Specifications — Shall be defined to mean the written technical descriptions, that <br />accompany the Drawings of all materials, equipment and other construction systems, including the <br />quantity and quality associated therewith, as well as other standards and workmanship as applied to <br />the Work and certain administrative details applicable thereto that the CONTRACTOR is obligated <br />to prepare to the complete satisfaction of the CITY which is deemed one hundred percent (100 %) <br />complete for the construction of the entire Project. <br />1.18 Substantial Completion. Means that point at which the Work is at a level of <br />completion in substantial compliance with the Agreement such that the City can use, occupy and/or <br />operate the Project in all respects to its intended purpose. Substantial Completion shall not be deemed <br />to have occurred until any and all government entities, which regulate or have jurisdiction over the <br />Project, have inspected and approved the Project. Beneficial use or occupancy shall not be the sole <br />determining factor in determining whether Substantial Completion has been achieved, unless a <br />temporary certificate of occupancy has been issued. <br />1.19 Project — The Project means the design and construction of a Pedestrian Bridge over <br />westbound SR 826 (aka Sunny Isles Boulevard) to connect a parcel of City-owned property that lies <br />between eastbound and westbound SR826 ramps. The services include Design Services, Survey, <br />Permits, MOT, Demolition, Construction, Coordination with all Utility Relocations, Design, Review, <br />Best Value Analysis including cost estimates, GMP and Project management and coordination with <br />City personnel (per the DCP 5 of 27), and as generally described information contained in City of <br />Sunny Isles Beach RFP No. 13 -08 -01 Gateway Park Pedestrian Access Improvements — Step 2 <br />Technical Proposal, and all other incidentals thereto identified by the CITY during the design and <br />construction phases of the Project which the CITY concludes, at its sole discretion, are required to be <br />included complete the Project. <br />1.20 Subcontractor - An individual, firm or corporation having a direct Contract with <br />CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the <br />site. <br />1.21 Supplier - A manufacturer, fabricator, supplier, distributor, materialman or vendor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.