Laserfiche WebLink
April 18, 2023 / Page 2 of 3 <br />Town Center Park I Project #11723.03 <br />City of Sunny Isles Beach <br />Contract Addendum # 02 <br />Issue Clarifications <br />KEITH shall issue all instructions and revisions of the CITY to Contractor(s); issue necessary <br />interpretations and clarifications of the contract documents; have authority, to require special inspection <br />or testing of the work; act as initial interpreter of the requirements of the contract documents and judge <br />of the acceptability of the work there under, and make decisions on all claims of the CITY and <br />contractor(s) relating to the acceptability of the work or the interpretation of the requirements of the <br />contract documents pertaining to the execution and progress of the work. <br />Meetings and Conference calls <br />KEITH shall attend and or participate in periodic project meetings and conference calls as requested by the <br />CLIENT/CITY. KEITH shall review requests for information prepared by the Contractor and respond <br />accordingly to all parties. KEITH will prepare drawings supplemental information needed to address the <br />contractor's request for information. <br />As-builts Review <br />KEITH will review the record drawings (as-builts) to ensure substantial conformance to the permitted plans <br />twice. Additional reviews due to non-compliant As-builts submitted by the contractor, may impact schedule <br />and will require additional fees. The contractor will be expected to have the as-builts revised in accordance <br />with all comments. <br />Final Inspections <br />KEITH shall participate with the CITY's representative, in a semi-final inspection for the purpose of <br />determining if the project is substantially complete and participate in the preparation of a written "Punch List" <br />of any defective or deficient items. <br />KEITH shall participate in a final inspection together with CITY and contractor representatives to verify <br />"Punch List" items are complete, and in substantial conformance to the permitted plans. <br />Additional inspections due to non-compliant Punch List item, may impact schedule and will require additional <br />fees. <br />Upon satisfactory completion of the final inspection, KEITH shall certify the work has been completed in <br />substantial conformance to the permitted plans, subject to any conditions therein expressed. <br />Final Certifications <br />KEITH will prepare final certification to all appropriate permitting agencies utilizing record drawings for the <br />design from the survey information supplied by the contractor, or by other means agreed to by both KEITH <br />and CITY. <br />We anticipate the following items requiring as -built certification: <br />• Overall Paving Grading and Drainage System <br />Task 802 Construction Support Services — Lighting and Electrical <br />(SGM Engineering — Electrical Sub.) <br />Refer to Exhibit `A' — SGM Engineering (Sub -Consultant) <br />In coordination with KEITH, SGM Engineering will provide construction support services for lighting and <br />electrical engineering. <br />V Engineering Inspired Design. <br />