My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3503
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:27:52 PM
Creation date
6/13/2023 11:26:32 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3503
Date (mm/dd/yyyy)
05/18/2023
Description
Agreement with Sleiman Construction, LLC for the Meditation Garden located at the Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />shall be suspended until such time as the City obtains the requested <br />documentation; <br />(d) objective evidence that the balance of the Work cannot be completed in accordance <br />with the Contract for the unpaid balance of the Contract Price; <br />(e) evidence that the Work will not be completed in the time required for final <br />completion; <br />(f) persistent failure to carry out the Work in accordance with the Contract; <br />(g) damage to the City or a third party to whom the City is, or may be liable; <br />(h) failure to comply with 5.2.3 of this section. <br />In the event that the City makes written demand upon the Contractor for amounts previously <br />paid by the City as contemplated in this Subparagraph 5.3.1, the Contractor shall comply <br />with such demand within ten (10) days of receipt of same. <br />5.4 Completion and Final Payment <br />5.4.1 When all of the Work is finally complete and the Contractor is ready for a <br />final inspection, it shall notify the City and the City's Representative thereof in writing. <br />Thereupon, the City's Representative will make final inspection of the Work and, if the <br />Work is complete in full accordance with the Contract Documents and this Contract has <br />been fully performed, the City's Representative will promptly issue a final Certificate for <br />Payment certifying to the City that the Project is complete and the Contractor is entitled to <br />the remainder of the unpaid Contract Price, less any amount withheld pursuant to this <br />Contract. If the City's Representative is unable to issue its final Certificate for Payment <br />and is required to repeat its final inspection of the Work due to deficient work by Contractor <br />or any party retained by the Contractor to perform work or supply materials under the <br />Agreement, the Contractor shall bear the cost of such repeat final inspection(s) which cost <br />may be deducted by the City from the Contractor's final payment. <br />5.4.2 As a condition precedent to final payment to the Contractor, the Contractor shall <br />deliver to the City the following documents in a form acceptable to the City: <br />a) Project Record Documents including As -built Drawings and Specifications, Addenda, <br />Construction Schedule, Change Orders, and other modifications of the Contract, <br />Approved Shop Drawings, Product Data and Samples, and Field Test records. <br />b) Operating and Maintenance Instructions: Submit instructions and/or manuals for <br />operating equipment and systems as prepared in accordance with the requirements of <br />the applicable equipment specifications sections. <br />c) Warranties and Bonds: As applicable and in accordance with the requirements of the <br />individual sections of the specifications. <br />d) Affidavit that all payrolls, invoices for materials and equipment, and other liabilities <br />connected with the Work for which the City, or the City's property might be <br />responsible, have been fully paid or otherwise satisfied. <br />
The URL can be used to link to this page
Your browser does not support the video tag.