Laserfiche WebLink
KIM <br />City o, f Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />(e) evidence that the Work will not be completed in the time required for final <br />completion; <br />(f) persistent failure to carry out the Work in accordance with the Contract; <br />(g) damage to the City or a third party to whom the City is, or may be liable; <br />(h) failure to comply with 5.2.3 of this section. <br />In the event that the City makes written demand upon the Contractor for amounts previously <br />paid by the City as contemplated in this Subparagraph 5.3.1, the Contractor shall comply <br />with such demand within ten (10) days of receipt of same. <br />5.4 Completion and Final Payment <br />5.4.1 When all of the Work is finally complete and the Contractor is ready for a <br />final inspection, it shall notify the City and the City's Representative thereof in writing. <br />Thereupon, the City's Representative will make final inspection of the Work and, if the <br />Work is complete in full accordance with the Contract Documents and this Contract has <br />been fully performed, the City's Representative will promptly issue a final Certificate for <br />Payment certifying to the City that the Project is complete and the Contractor is entitled to <br />the remainder of the unpaid Contract Price, less any amount withheld pursuant to this <br />Contract. If the City's Representative is unable to issue its final Certificate for Payment <br />and is required to repeat its final inspection of the Work due to deficient work by Contractor <br />or any party retained by the Contractor to perform work or supply materials under the <br />Agreement, the Contractor shall bear the cost of such repeat final inspection(s) which cost <br />may be deducted by the City from the Contractor's final payment. <br />5.4.2 As a condition precedent to final payment to the Contractor, the Contractor shall <br />deliver to the City the following documents in a form acceptable to the City: <br />a) Project Record Documents including As -built Drawings and Specifications, Addenda, <br />Construction Schedule, Change Orders, and other modifications of the Contract, <br />Approved Shop Drawings, Product Data and Samples, and Field Test records. <br />b) Operating and Maintenance Instructions: Submit instructions and/or manuals for <br />operating equipment and systems as prepared in accordance with the requirements of <br />the applicable equipment specifications sections. <br />c) Warranties and Bonds: As applicable and in accordance with the requirements of the <br />individual sections of the specifications. <br />d) Affidavit that all payrolls, invoices for materials and equipment, and other liabilities <br />connected with the Work for which the City, or the City's property might be <br />responsible, have been fully paid or otherwise satisfied. <br />e) Lien releases and waivers of payment bond claims from all Subcontractors and <br />releases from the Contractor to the City as required by the City's Representative or <br />the City. <br />f) Consent of surety to final payment. <br />g) A duly executed assignment of any and all warranties required by the Contract <br />Documents. <br />10 <br />