My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3504
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 4:00:33 PM
Creation date
6/13/2023 11:31:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3504
Date (mm/dd/yyyy)
05/18/2023
Description
Agreememt with The Stout Group, Inc, for construction services at East End of 172nd Street Roadway & Drainage Improvement Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />Work accomplished by subcontractors shall be considered to be just and fu.illy <br />compensated for by adding an amount equal to FIFTEEN PERCENT (15%) of the sum <br />of material and labor costs as defined under Material costs and Labor costs below, but <br />excluding equipment rental costs and bond allowance. <br />(e) Contractor'srp ofit may then be added into the above material costs and labor <br />costs, including the Overhead allowance at the rate of FIFTEEN PERCENT (15%) <br />of the sum of those costs, excluding equipment rental costs. <br />10.3.3.5 Bond Allowance: For maintaining the Public Construction Bond at <br />100% of the Contract Price, a sum of ONE PERCENT (1 %) of the total cost of the <br />change (including material, labor, overhead and profit, and equipment rental) shall <br />be allowed on all change orders. <br />10.3.3.6 Material costs actually recorded by the Contractor and the subcontractor <br />as materials are delivered to the site and, as evidenced fiom originally receipted <br />invoices, listing appropriate quantities and unit prices. Records in proper form shall <br />be maintained and made available to the City's Representative and the City at all <br />times. <br />Material costs shall be at actual cost inclusive of conduit, couplers, elbows, glue, end caps, <br />pull string / tape, and delivery charges based on the Consumer Pricing Index (CPI) effective <br />August 1, 2021. The parties agree that a subsequent evaluation of material costs will be <br />accomplished every sixty (60) days after the issuance of the Notice to Proceed to assess <br />variances in market pricing for material. Should it become necessary or proper during the <br />term of the Contract to adjust the Contract Price for variations in material costs based upon <br />the CPI, the parties agree that an equitable adjustment to the material costs for either <br />increases or decreases shall be accomplished by either a change in the Contract Price <br />utilizing a Change Order, or by contingency expenditure. <br />10.3.3.7 Labor Costs represented by the actual wages paid to all laborers, <br />apprentices, journeymen, and foremen involved in and necessary to completing the <br />particular construction operations, for each day and every hour such labor teams and <br />foremen are actually employed on the extra work required, including the net cost of <br />insurance, social security and Worker's Compensation. Records in proper form shall <br />be maintained and be made available to the Engineer/Architect and the City at all <br />times. <br />10.3.3.8 Rentals for special equipment or machinery such as power driven roller, <br />tractors, trucks, shovels, drills, mixers, pumps, hoists, etc. required for the economical <br />performance of the work at reasonable rental prices agreed upon before work <br />commences, shall be allowed to the Contractor and subcontractors by the City's <br />Representative and the City for each and every hour such special equipment is in use on <br />the particular work. To the sum of such equipment rentals, no additional percentage <br />shall be added. <br />10.3.3.9 Owned Equipment for certain owned heavy or specialized equipment <br />(defined as tools and equipment with an individual purchase cost of more than Ten <br />?Z 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.