My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3504
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 4:00:33 PM
Creation date
6/13/2023 11:31:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3504
Date (mm/dd/yyyy)
05/18/2023
Description
Agreememt with The Stout Group, Inc, for construction services at East End of 172nd Street Roadway & Drainage Improvement Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />1.5.7 Words or terms used as nouns in this Contract shall be inclusive of their singular <br />and plural forms, unless the context of their usage clearly requires a contrary meaning. <br />1.5.8 The Contractor shall have a continuing duty to read, carefully study, and <br />compare each of the Contract Documents, and shall give written notice to the City of any <br />inconsistency, ambiguity, error or omission which the Contractor may discover with <br />respect to these documents before proceeding with the affected Work. The issuance, or the <br />express or implied approval by the City, the City's Representative, or the City's Consultant <br />Engineer, of the Contract Documents shall not relieve the Contractor of the continuing <br />duties imposed hereby, nor shall any such approval be evidence of the Contractor's <br />compliance with this Contract. The City has requested the City's Consultant Engineer to <br />only prepare documents for the Project, including the Specifications for the Project, which <br />are accurate, adequate, consistent, coordinated, and sufficient for construction. HOWEVER, <br />THE CITY MAKES NO REPRESENTATION OR WARRANTY OF ANY NATURE <br />WHATSOEVER TO THE CONTRACTOR CONCERNING SUCH DOCUMENTS. By the <br />execution hereof, the Contractor acknowledges and represents that it has received, reviewed, <br />and carefully examined such documents consistent with the standard applicable to similarly <br />situated contractors and not the standard applicable to design professionals, has found them <br />to be complete, accurate, adequate, consistent, coordinated, and sufficient for construction, <br />and that the Contractor will rely upon the representation or warranties by the City concerning <br />such documents. The Contractor further acknowledges and represents that it has made a <br />thorough and careful examination and inspection of existing above ground surface <br />conditions on the Project site, and the Contractor expressly acknowledges and agrees <br />that it shall make no claim for additional compensation due to existing above ground surface <br />conditions that could be determined or ascertained from a thorough and careful above ground <br />examination and inspection of the site. <br />1.5.9 In the event of any conflict in the Contract Documents, the following documents <br />shall take precedence in the following order of precedence: <br />(a) any Change Orders; <br />(b) the Addenda; <br />(c) the Specifications; <br />(d) the Drawings; <br />(e) any Supplemental Conditions; <br />(f) the Contract for Construction; <br />(g) the City's Bid; <br />(h) the Contractor's Representations made at the Post -bid Conference; <br />(i) the Contractor's Response <br />As between numbers and scaled measurements on the Drawings, the numbers shall <br />govern; as between larger scale and smaller scale drawings, the larger scale shall govern. <br />1.5.10 Neither the organization of any of the Contract Documents into divisions, <br />sections, paragraphs, articles, (or other categories), nor the organization or arrangement of <br />the Design, shall control the Contractor in dividing the Work or in establishing the extent <br />or scope of the Work to be performed by Subcontractors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.