My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Bermello Ajamil & Partners, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:23:40 AM
Creation date
8/18/2014 4:33:06 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br />O <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />O <br />O <br />O <br />O <br />0 <br />O <br />0 <br />0 <br />QUALIFICATIONS <br />EXPERIENCE <br />Pompano Beach Boulevard <br />B&A was commissioned to assess & recommend improvements to <br />Beach Bathrooms and <br />the existing beach bathroom pavilions, part of the overall Pompano <br />Beach Boulevard Improvement project. The Primary Objective for <br />Beach Pavilions <br />both beach bathrooms was is to identify current conditions and <br />Pompano Beach, Florida <br />provide recommendations including: <br />1. Upgrades for ADA and accessibility compliance; and <br />Client: Pompano Beach CRA <br />petting implications <br />2. Upgrades due to regular wear and tear as a public facility. <br />3. Upgrades due to weather induced deterioration (corrosion, rusting. <br />or other material oxidation from salt air, sand, sun, etc); and <br />4. Improvements to architectural style and /or building vocabulary <br />to compliment proposed architectural theme as part of the <br />Pompano Beach Boulevard master Plan. <br />Cha ....,. R <br />Different designs were presented; the desired option consisting of the <br />removal of all existing stucco veneer and replacing all walls with a <br />new "Key west' style of painted fiber cement / stucco lap siding and <br />trim with a fresh color palate that includes a striking blue standing <br />seam metal roof. The (3) three existing Beach Pavilions received the <br />some new standing metal roofs and color scheme to match the <br />bathrooms and Kiosk establishing a consistent, exciting and unique <br />vocabulary and beach theme for all buildings along Pompano <br />CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.