Laserfiche WebLink
RELEVANT EXPERIENCE <br />PROJECT NAME: <br />Chapman Field Park <br />New Pedestrian /Bike <br />Paths and Parking Lot <br />CLIENT'S NAME: <br />Miami -Dade County <br />Park & Rec. Depart <br />Ms. Lydia Salas <br />305 - 755 -5456 <br />TYPE OF FACILITY <br />Pedestrian /Bike Path, <br />OR SERVICES: <br />Access Road, Canoe <br />Ramp, and Parking Lot <br />SRS PROJECT FEE: <br />555,818 <br />CONSTRUCTION <br />COST: <br />$1,610,000 <br />COMPLETION DATE: <br />September 2011 <br />KEY INDIVIDUALS <br />Ignacio Serralta, P.E. <br />INVOLVED: <br />Oliverio Sanchez, P.E. <br />Jean - Claude Fontaneau <br />PROJECT DESCRIPTION: <br />SRS provided the engineering design, permitting <br />and construction phase services of a <br />pedestrian /bike path, access road, parking area, <br />and canoe ramp. The work included the <br />geometric design of the pedestrian /bike paths <br />and parking lot, design site paving, grading, and <br />drainage plans. Work within a previous landfill <br />site and contaminated soils. Coordinating the <br />work with other subconsultants including <br />Surveyors, Geotechnical, Structural Engineers <br />and environmental consultants. Our scope of <br />work also included preparing and submitting <br />permit applications and construction plans for <br />"dry-run" and "final" review by local regulatory <br />agencies including Miami -Dade County Building <br />Department, Miami -Dade Public Works Dept., <br />and DERM (Class I, IV, & VI); as well as, <br />Environment Resources Permit (ERP) for costal <br />construction and impacts to wetlands and <br />mangroves. <br />Construction Phase services included weekly <br />construction meetings, reviewing shop drawings, <br />responding to RFI's, providing on -site daily <br />construction observations, and preparing close- <br />out documents. <br />1�uf <br />ENGINEERING�INC. <br />