My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE <br />K .P ✓.y �_ a - -+tea. p+ q� <br />PROJECT NAME: Miami -Dade County <br />Fire Rescue Stations <br />CLIENT'S NAME: Landera Associates, <br />P.A. <br />Mr. Osvaldo L. Landera <br />TYPE OF FACILITY Fire Rescue Stations <br />OR SERVICES: <br />SRS PROJECT FEE: <br />COMPLETION DATE: <br />KEY INDIVIDUALS <br />INVOLVED: <br />PROJECT DESCRIPTi <br />$150,666.00 <br />On -going <br />Ignacio Serralta, P.E. <br />Oliverio Sanchez, P.E. <br />Marilys Falcon <br />:ON: <br />SRS prepared the site civil engineering design <br />plans and specifications for the construction of four <br />new fire rescue stations for Miami -Dade County. <br />Services rendered included the design of site <br />utilities (water, fire and sewer), parking area <br />paving and grading, site grading, and drainage <br />plans. Work included preparation of ERP permits <br />for wetlands and DERM coastal permits <br />SRS also coordinated with local regulatory agencies <br />to obtain approvals on utility connections, prepared <br />and submitted plans and applications for "dry-run" <br />and final review by regulatory agencies, and <br />attended project meetings and pre - design field site <br />visits. Construction Phase services included weekly <br />construction meetings, reviewing shop drawings, <br />responding to RFI's, providing periodic construction <br />observations, and preparing close -out documents. <br />Stations included: <br />• Homestead Fire Rescue Station No. 16 <br />• Doral North Fire Rescue Station No. 69 <br />• Model Cities Fire Rescue Station No. 2 <br />• Sunny Isles Beach Fire Rescue Station No. 10 <br />Miami � Camta I. Rescue Oeyvrcmmt <br />Ilmunl F Rescue Swioo:\n 16 <br />Model Cities Fire Rescue Station No.2 <br />\. <br />Mum1 Dade Fire Rescue Department <br />Sunny Isles Reach Fire Resmle Station No. 10 <br />.. ffin� <br />} <br />ENGINEERING.INC. <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.