My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />RELEVANT EXPERIENCE <br />PROJECT NAME: CEO - Pinehurst <br />CLIENT'S NAME: City of Miami <br />TYPE OF FACILITY Construction <br />OR SERVICES: Engineering and <br />Observation Services <br />Pinehurst Storm Sewer <br />Retrofitting Project <br />SRS PROJECT FEE: $160,000 <br />COMPLETION DATE: January 2006 <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: <br />PROJECT DESCRIPTION: <br />SRS supplied engineering and technical personnel on an <br />as needed basis to the City of Miami to provide <br />Construction Engineering and Observation Services for <br />the administration of several construction projects <br />throughout the City of Miami. For this project, SRS <br />provided full -time on -site inspection personnel and <br />supervisor for the duration of the construction. <br />The specific tasks involved in the project included <br />o Drainage Improvements <br />o Curb, Gutter and Sidewalk Replacement <br />• Milling and Resurfacing <br />• Traffic Signal Improvements <br />• Construction coordination <br />• Supervise inspectors <br />o Schedule and attend construction meetings <br />• Monitor contractor's work <br />• Review and process contractors' application for <br />payment <br />• Maintain daily project journal with photographs <br />o Administration of changed work <br />• Provide problem resolution <br />• Request and review material testing <br />n Coordinate with Engineer <br />• Coordinate with utility companies <br />o Project closeout <br />• Construction cost 32,360,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.