My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chisholm Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Chisholm Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:30:13 AM
Creation date
8/18/2014 4:56:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 r <br />C <br />E <br />Miami -Dade County Public Schools <br />Department of A/E Selection & Negotiations <br />PROJECT REFERENCE FORM <br />(This form Is to be submitted with the RFQ Response) <br />instructions to Proposer: Submit a separate Project Reference Form for each project listed in the proposef's RFQ Response. It is the proposer's responsibildy to <br />.. _.._.__ _.e__ r__ ___l rlr ..d n......, u.l.✓...da. edd:v,e 1 92 9 /vin nn1 rrll in mrlinn n. <br />(The Wowing section is to be completed by the Owner's representative) <br />Statement to Owner's Representative: In an effort to assure a high standard of quality on our design/construction projects (or construction- related services), we <br />are seeking information from you on this firm's performance on the specific projed fisted above. We have asked each proposer to secure references Iran the owner <br />on each project submitted as related experience and as an example of the firm's w wk. The authority making reference must be a key member of the project team <br />_ ___d- .I��....d........m tfCnOffbnnnrerl /nr mncfrurfinn- m /afaA <aMfxtl. <br />WW <br />eL4UllWtl, W11W11 Y1IVl /1lp,lw „w aou, u.ry vniw ..wvv....v- .���. +.. _ -- <br />1 <br />NAME OF PROPOSER (PRIME FIRM): R.E. Chisholm Architects, Inc. <br />SOLICITATION FOR: AIE of Record (project- specific) ` A/EPC or SPC (continuing contract) <br />` DesigntBulder ` CM at -Risk (project- spedfic) CM al -Risk (continuing contract) <br />` Program Manager ` Land Surveyor ` Geotechnical Lab <br />` HVAC T &B ` Cost Estimating ` Construction Scheduling <br />m Quality of the communicationsicoordination with project team, members, <br />2. <br />PROJECT NAME & TITLE: <br />Miami Dade County Parks and Recreation - Southridge Park Stadium <br />FOR AIE. AIEPC & SPC: <br />EXAMPLE PROJECT KEY NUMBER <br />'F): <br />m Quality of the project <br />(SF 330, Section <br />PROJECT LOCATION (Address City & State): 11250 SW 192nd St, Miami, FL 33157 <br />PROJECT VALUE: $ 2.498 M. <br />I SUBST. COMPLETION DATE: 2005 -2011 <br />Name of Owner's representative completing this form (print): i I_L iaZ" o 'R <br />PROPOSER'S CONTRACTURAL RELATIONSHIP TO OWNER ON THIS PROJECT: Design Criteria Consultant <br />Sign <br />Date: G G ja <br />3 <br />PROJECT OWNER: Miami Dade County Parks & Recreation Department (MDCPRD) <br />OWNER'S REPRESENTATIVE: Mr. Guillermo Pena <br />TITLE: Project Manager <br />OFFICE 1 DEPARTMENT: MDCPRD - Design Development Division <br />PHONE NO.: (305) 755 -7914 <br />ADDRESS (Address City & State): 275 NW 2nd Street, 4th Floor Miami, FI 33128 <br />E -MAIL: wiliep @miamidade.gov <br />(The Wowing section is to be completed by the Owner's representative) <br />Statement to Owner's Representative: In an effort to assure a high standard of quality on our design/construction projects (or construction- related services), we <br />are seeking information from you on this firm's performance on the specific projed fisted above. We have asked each proposer to secure references Iran the owner <br />on each project submitted as related experience and as an example of the firm's w wk. The authority making reference must be a key member of the project team <br />_ ___d- .I��....d........m tfCnOffbnnnrerl /nr mncfrurfinn- m /afaA <aMfxtl. <br />WW <br />Wtli l 661 I11VVIYw n,ul ll�a 2 l uiry w..u.... w.v.. v. ...v ._____ - -- - <br />4 <br />Owner's Representative p irds only as box foreach) <br />If fro•; exptala under <br />a. Is the Information listed In section 2, above, accurate? NO ommeb' ” <br />b. How would you rate the overall performance of this firm In terms of: FAIR I POOR <br />m Timely completion of the project, <br />m Cost effectiveness (was project within budget), <br />m Quality of the communicationsicoordination with project team, members, <br />m Responsiveness to the owner, and <br />m Quality of the project <br />c. Would you do business with this firm again? LCYES I NO MAYBE <br />d Comments? <br />Name of Owner's representative completing this form (print): i I_L iaZ" o 'R <br />Sign <br />Date: G G ja <br />per Please return this form v►a emarr wimm a nus►ness 0a <br />Pmcedures for Sefecifoo of Architects and Engineers <br />FM -7516 (10-13) <br />Page 31 of 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.